Permit: TC-MDP-0124-00152
Permit Details
Apply Date:
01/29/2024
Applicant:
Joshua Swinney
Description:
Big Bend Model Plan La Escalera
Permit Reviews
Permit Number - TC-MDP-0124-00152
Permit Status: Complete
Permit Description: Big Bend Model Plan La Escalera
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/07/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/14/2024 | APPROVED |
10/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/21/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00152
Permit Status: Complete
Permit Description: Big Bend Model Plan La Escalera
Date | Description | Comments |
---|---|---|
02/20/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
02/07/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/20/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/21/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/14/2024 | Post-Tension Inspection Report is required. | |
01/29/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/29/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
12/12/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/07/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
01/20/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00152
Permite Description: Big Bend Model Plan La Escalera
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | No gas appliances in this subdivision. Clearance and gas pressure test not required. |
07/12/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | No gas appliances in this subdivision. Clearance and gas pressure test not required. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00152
Permit Description: Big Bend Model Plan La Escalera
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/11/2024 | COT - RSPL - Rough Soil | Passed | ||
04/12/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/02/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
05/02/2024 | COT - RSBU - Preslab | Passed | ||
05/02/2024 | COT - RSEL - Electrical Underground | Passed | ||
05/02/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
05/24/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
05/24/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in are complete. Okay to proceed with insulation and drywall installation. | |
07/25/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/30/2024 | BULD - Electrical Clearance | Passed | ECO Clearance issued to TEP for 7426 S Keller Ln. Okay to energize panel. | |
08/30/2024 | COT - RSPL - Sewer | Passed | 8/30/24: Underground plumbing is connected to sewer with green tracer wire running from clean-out to sewer connection. Okay to shade pipe and backfill trench. | |
09/17/2024 | RSBU - Building Progress | Passed | 9/17/24: 18 inches of copper top and bottom before sweat joint outside of wall main water line | |
10/30/2024 | ENGR Engineering Final | Passed | ||
10/31/2024 | COT - RSEL - Electrical Final | Passed | 10-31-24, items from previous inspection have been corrected. Final approved. | |
10/31/2024 | COT - RSEL - Outdoor Lighting | Passed | 10-31-24, items from previous inspection have been corrected. Final approved. | |
10/31/2024 | COT - RSME - Mechanical Final | Passed | 10-31-24, items from previous inspection have been corrected. Final approved. | |
10/31/2024 | COT - RSPL - Plumbing Final | Passed | 10-31-24, items from previous inspection have been corrected. Final approved. | |
10/31/2024 | RSBU - Building Final | Passed | 10-31-24, items from previous inspection have been corrected. Final approved. |