Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
7438 S KELLER LN
Apply Date:
01/30/2024
Applicant:
Joshua Swinney
Description:
Big Bend Model Plan La Escalera

Permit Reviews

Permit Number - TC-MDP-0124-00151
Permit Status: Complete
Permit Description: Big Bend Model Plan La Escalera
Start Date Submittal Complete Date Status  
09/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/18/2024 APPROVED Review Details
01/30/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/31/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0124-00151
Permit Status: Complete
Permit Description: Big Bend Model Plan La Escalera
Date Description Comments
04/03/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/20/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/03/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/18/2024 Post-Tension Inspection Report is required.
04/03/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/12/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/03/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
12/12/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/18/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/20/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
04/03/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00151
Permite Description: Big Bend Model Plan La Escalera
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
06/24/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable
09/27/2024 COT - RSEL - Electrical Final N/A Re-inspection required Master bath needs shower head and faucet. Exhaust fans need covers in up stairs baths. Second bedroom has a buried receptacle.

9/27/2024
09/27/2024 COT - RSEL - Outdoor Lighting N/A Re-inspection required Master bath needs shower head and faucet. Exhaust fans need covers in up stairs baths. Second bedroom has a buried receptacle.

9/27/2024
09/27/2024 COT - RSME - Mechanical Final N/A Re-inspection required Master bath needs shower head and faucet. Exhaust fans need covers in up stairs baths. Second bedroom has a buried receptacle.

9/27/2024
09/27/2024 COT - RSPL - Plumbing Final N/A Re-inspection required Master bath needs shower head and faucet. Exhaust fans need covers in up stairs baths. Second bedroom has a buried receptacle.

9/27/2024
09/27/2024 RSBU - Building Final N/A Re-inspection required Master bath needs shower head and faucet. Exhaust fans need covers in up stairs baths. Second bedroom has a buried receptacle.

9/27/2024

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00151
Permit Description: Big Bend Model Plan La Escalera
Total Completed Inspections - 19
Date Description Inspector Results Comments
04/03/2024 COT - RSPL - Rough Soil Passed
04/17/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set in place, post tension cabling is properly installed, rebar reinforcement is in place per plans, UFER Ground is in place on right side of garage, and all footings are free of debris. Okay to pour concrete for footings and concrete slab.
04/17/2024 COT - RSBU - Preslab Passed Concrete forms are set in place, post tension cabling is properly installed, rebar reinforcement is in place per plans, UFER Ground is in place on right side of garage, and all footings are free of debris. Okay to pour concrete for footings and concrete slab.
04/17/2024 COT - RSEL - Electrical Underground Passed Underground electrical is in place for kitchen island. Okay to pour concrete.
04/17/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set in place, post tension cabling is properly installed, rebar reinforcement is in place per plans, UFER Ground is in place on right side of garage, and all footings are free of debris. Okay to pour concrete for footings and concrete slab.
04/17/2024 COT - RSPL - Yard Water Line Passed 4/17/24: Water line is under 50# of air pressure with no leaks. Okay to shade pipe and backfill trench.
05/20/2024 COT - RSBU - Roof Nailing Passed
05/24/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/27/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/10/2024 COT - RSBU - Interior Shear Bracing Passed Drywall on interior shear walls is properly screwed off to studs per the plan. Okay to proceed with tape, texture, and paint of all walls and ceilings.
08/22/2024 COT - RSPL - Sewer Passed
09/13/2024 RSBU - Building Progress Passed Contractor has opened up walls in garage at water supply line, plumber has installed 18+ inches of copper pipes from pex line to first solder joint to meet install requirements.
09/18/2024 BULD - Electrical Clearance Passed TEP ECO
09/27/2024 ENGR Engineering Final Passed CO ready
09/30/2024 COT - RSEL - Electrical Final Passed 9/30/24: Plumbing and mechanical issues have been corrected, plans do not show receptacles in 2nd bedroom near entrance. Construction is complete per plans. Okay to issue CERTIFICATE OF OCCUPANCY.
09/30/2024 COT - RSEL - Outdoor Lighting Passed 9/30/24: Outdoor lighting is properly installed per plan and city guidelines.
09/30/2024 COT - RSME - Mechanical Final Passed 9/30/24: Plumbing and mechanical issues have been corrected, plans do not show receptacles in 2nd bedroom near entrance. Construction is complete per plans. Okay to issue CERTIFICATE OF OCCUPANCY.
09/30/2024 COT - RSPL - Plumbing Final Passed 9/30/24: Plumbing and mechanical issues have been corrected, plans do not show receptacles in 2nd bedroom near entrance. Construction is complete per plans. Okay to issue CERTIFICATE OF OCCUPANCY.
09/30/2024 RSBU - Building Final Passed 9/30/24: Plumbing and mechanical issues have been corrected, plans do not show receptacles in 2nd bedroom near entrance. Construction is complete per plans. Okay to issue CERTIFICATE OF OCCUPANCY.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 54 SIC-2024-09-16_V1.PDF DOCUMENTS VIEW
Z160 BIG BEND- TRUSS REVIEW LETTER - LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 54 PLOT PLAN_V1.PDF DOCUMENTS VIEW