Permit: TC-MDP-0124-00151
Permit Details
Apply Date:
01/30/2024
Applicant:
Joshua Swinney
Description:
Big Bend Model Plan La Escalera
Permit Reviews
Permit Number - TC-MDP-0124-00151
Permit Status: Complete
Permit Description: Big Bend Model Plan La Escalera
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/18/2024 | APPROVED |
01/30/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/31/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00151
Permit Status: Complete
Permit Description: Big Bend Model Plan La Escalera
Date | Description | Comments |
---|---|---|
04/03/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
09/18/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/20/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/03/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
09/18/2024 | Post-Tension Inspection Report is required. | |
04/03/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/03/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
12/12/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
09/18/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
01/20/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
04/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00151
Permite Description: Big Bend Model Plan La Escalera
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/24/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
09/27/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | Master bath needs shower head and faucet. Exhaust fans need covers in up stairs baths. Second bedroom has a buried receptacle. 9/27/2024 |
09/27/2024 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | Master bath needs shower head and faucet. Exhaust fans need covers in up stairs baths. Second bedroom has a buried receptacle. 9/27/2024 |
09/27/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | Master bath needs shower head and faucet. Exhaust fans need covers in up stairs baths. Second bedroom has a buried receptacle. 9/27/2024 |
09/27/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | Master bath needs shower head and faucet. Exhaust fans need covers in up stairs baths. Second bedroom has a buried receptacle. 9/27/2024 |
09/27/2024 | RSBU - Building Final | N/A | Re-inspection required | Master bath needs shower head and faucet. Exhaust fans need covers in up stairs baths. Second bedroom has a buried receptacle. 9/27/2024 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00151
Permit Description: Big Bend Model Plan La Escalera
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/03/2024 | COT - RSPL - Rough Soil | Passed | ||
04/17/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set in place, post tension cabling is properly installed, rebar reinforcement is in place per plans, UFER Ground is in place on right side of garage, and all footings are free of debris. Okay to pour concrete for footings and concrete slab. | |
04/17/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set in place, post tension cabling is properly installed, rebar reinforcement is in place per plans, UFER Ground is in place on right side of garage, and all footings are free of debris. Okay to pour concrete for footings and concrete slab. | |
04/17/2024 | COT - RSEL - Electrical Underground | Passed | Underground electrical is in place for kitchen island. Okay to pour concrete. | |
04/17/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set in place, post tension cabling is properly installed, rebar reinforcement is in place per plans, UFER Ground is in place on right side of garage, and all footings are free of debris. Okay to pour concrete for footings and concrete slab. | |
04/17/2024 | COT - RSPL - Yard Water Line | Passed | 4/17/24: Water line is under 50# of air pressure with no leaks. Okay to shade pipe and backfill trench. | |
05/20/2024 | COT - RSBU - Roof Nailing | Passed | ||
05/24/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
06/27/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/10/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall on interior shear walls is properly screwed off to studs per the plan. Okay to proceed with tape, texture, and paint of all walls and ceilings. | |
08/22/2024 | COT - RSPL - Sewer | Passed | ||
09/13/2024 | RSBU - Building Progress | Passed | Contractor has opened up walls in garage at water supply line, plumber has installed 18+ inches of copper pipes from pex line to first solder joint to meet install requirements. | |
09/18/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
09/27/2024 | ENGR Engineering Final | Passed | CO ready | |
09/30/2024 | COT - RSEL - Electrical Final | Passed | 9/30/24: Plumbing and mechanical issues have been corrected, plans do not show receptacles in 2nd bedroom near entrance. Construction is complete per plans. Okay to issue CERTIFICATE OF OCCUPANCY. | |
09/30/2024 | COT - RSEL - Outdoor Lighting | Passed | 9/30/24: Outdoor lighting is properly installed per plan and city guidelines. | |
09/30/2024 | COT - RSME - Mechanical Final | Passed | 9/30/24: Plumbing and mechanical issues have been corrected, plans do not show receptacles in 2nd bedroom near entrance. Construction is complete per plans. Okay to issue CERTIFICATE OF OCCUPANCY. | |
09/30/2024 | COT - RSPL - Plumbing Final | Passed | 9/30/24: Plumbing and mechanical issues have been corrected, plans do not show receptacles in 2nd bedroom near entrance. Construction is complete per plans. Okay to issue CERTIFICATE OF OCCUPANCY. | |
09/30/2024 | RSBU - Building Final | Passed | 9/30/24: Plumbing and mechanical issues have been corrected, plans do not show receptacles in 2nd bedroom near entrance. Construction is complete per plans. Okay to issue CERTIFICATE OF OCCUPANCY. |