Permit: TC-MDP-0124-00142
Permit Details
Apply Date:
01/24/2024
Applicant:
John Sutton
Description:
SFR LE23004 T22-M0055
Permit Reviews
Permit Number - TC-MDP-0124-00142
Permit Status: Issued
Permit Description: SFR LE23004 T22-M0055
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/15/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/20/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00142
Permit Status: Issued
Permit Description: SFR LE23004 T22-M0055
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
01/24/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
03/15/2024 | Post-Installed Anchor Inspection Report is required. |
03/15/2024 | Post-Tension Inspection Report is required. |
03/15/2024 | Special inspection for Soil Testing is required. |
07/10/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0124-00142
Permit Status: Issued
Permit Description: SFR LE23004 T22-M0055
Date | Description | Comments |
---|---|---|
01/24/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/10/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0124-00142
Permit Description: SFR LE23004 T22-M0055
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/29/2024 | COT - RSPL - Sewer | Passed | ||
05/29/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/29/2024 | COT - RSPL - Rough Soil | Passed | ||
06/05/2024 | COT - RSBU - Preslab | Passed | ||
06/06/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/06/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/16/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Corrections were made. 7/16/2024 | |
07/16/2024 | COT - RSBU - Roof Nailing | Passed | Corrections were made. 7/16/2024 | |
09/13/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/13/2024 | RSBU - Building Progress | Passed | ||
09/26/2024 | COT - RSEL - Grounding/Bonding | Passed | Pass 9/26/2024 | |
09/26/2024 | BULD - Electrical Clearance | Passed | CLEARANCE TEP ECO 9/26/2024 | |
09/27/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made PASSED 9/27/2024 |