Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/24/2024
Applicant:
Daria Hopkins
Description:
SFR MERI132021 T21-M0062

Permit Reviews

Permit Number - TC-MDP-0124-00134
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Start Date Submittal Complete Date Status  
02/01/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/07/2024 APPROVED Review Details
11/15/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 11/19/2024 APPROVED Review Details
10/17/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/17/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0124-00134
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Date Description Comments
02/01/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/07/2024 Post-Tension Inspection Report is required.
01/24/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/24/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
02/01/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
02/07/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00134
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/24/2024 COT - RSPL - Yard Water Line Passed
04/24/2024 COT - RSPL - Sewer Passed
04/24/2024 COT - RSPL - Rough Soil Passed
04/24/2024 COT - RSPL - Backwater Valve Passed
05/15/2024 COT - RSBU - Preslab Passed 5/15/24: Passed ok to proceed
05/15/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 5/15/24: Passed ok to proceed
05/15/2024 COT - RSEL - Electrical Underground Passed
05/15/2024 COT - RSEL - Grounding/Bonding Passed
06/04/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/04/2024 COT - RSBU - Roof Nailing Passed
07/01/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 7/1/2024
07/01/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/01/2024 COT - RSPL - Gas Pressure Test Passed
07/16/2024 COT - RSBU - Interior Shear Bracing Passed
08/29/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/29/2024
09/09/2024 COT - RSEL - Electrical Final Passed
09/09/2024 COT - RSEL - Outdoor Lighting Passed
09/09/2024 COT - RSME - Mechanical Final Passed
09/09/2024 COT - RSPL - Plumbing Final Passed
09/09/2024 ENGR Engineering Final Passed Move in ready
09/09/2024 RSBU - Building Final Passed
09/09/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
TC-MDP-0124-00134 RESPONSE 11.12.24-2024-11-12_V2.PDF DOCUMENTS VIEW
PLAN 1320 TRUSS DESIGN DRAWINGS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 146 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 146 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 146 SPECIAL INSPECTION CERTIFICATE-2024-02-01_V1.PDF DOCUMENTS VIEW