Start Date Submittal Complete Date Status  
04/26/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00108
Permit Status: Inspections complete
Permit Description: VC 1383-130
Total Outstanding Activity Conditions - 8
Date Name
01/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/03/2023 Post-Tension Inspection Report is required.
04/03/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
04/29/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/29/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/29/2024 Post-Tension Inspection Report is required.
04/29/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/29/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0124-00108
Permit Status: Inspections complete
Permit Description: VC 1383-130
Date Description Comments
01/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00108
Permit Description: VC 1383-130
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/13/2024 COT - RSPL - Rough Soil Passed
05/13/2024 COT - RSPL - Sewer Passed
05/21/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/21/2024 COT - RSBU - Preslab Passed
05/21/2024 COT - RSEL - Electrical Underground Passed
05/21/2024 COT - RSEL - Grounding/Bonding Passed
06/06/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/06/2024 COT - RSBU - Roof Nailing Passed
06/26/2024 COT - RSPL - Gas Pressure Test Passed
06/26/2024 COT - RSPL - Yard Water Line Passed
06/28/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made. 6/28/204
07/05/2024 BULD - Electrical Clearance Passed TEP ECO
07/08/2024 COT - RSBU - Interior Shear Bracing Passed
08/09/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/9/2024
10/07/2024 COT - RSEL - Electrical Final Passed Passed 10/7/24
10/07/2024 COT - RSEL - Outdoor Lighting Passed Passed 10/7/24
10/07/2024 COT - RSME - Mechanical Final Passed Passed 10/7/24
10/07/2024 COT - RSPL - Plumbing Final Passed Passed 10/7/24
10/07/2024 ENGR Engineering Final Passed
10/07/2024 RSBU - Building Final Passed Passed 10/7/24
10/07/2024 RSBU - Building Progress Passed Passed 10/7/24

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
RESERVES AT VALENCIA CROSSING - LOT 42 START_V1.PDF DOCUMENTS VIEW