Permit: TC-MDP-0124-00106
Permit Details
Apply Date:
05/08/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2212-230 T22-M0018
Permit Reviews
Permit Number - TC-MDP-0124-00106
Permit Status: Inspections complete
Permit Description: SFR BT2212-230 T22-M0018
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/09/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 05/14/2024 | APPROVED |
05/03/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/03/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00106
Permit Status: Inspections complete
Permit Description: SFR BT2212-230 T22-M0018
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
01/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
01/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
05/13/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
05/13/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
05/13/2024 | Post-Tension Inspection Report is required. |
05/13/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0124-00106
Permit Status: Inspections complete
Permit Description: SFR BT2212-230 T22-M0018
Date | Description | Comments |
---|---|---|
01/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00106
Permite Description: SFR BT2212-230 T22-M0018
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/15/2024 | RSBU - Building Progress | N/A | Not Applicable | |
11/15/2024 | COT - RSME - Mechanical Final | N/A | Partial Pass | Crawl space needs either a new lightbulb, tried one, may have broke when climbing up, or no power to socket. 11/15/24 |
11/15/2024 | RSBU - Building Final | N/A | Re-inspection required | Re inspection required 11/15/24 |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00106
Permit Description: SFR BT2212-230 T22-M0018
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/11/2024 | COT - RSPL - Rough Soil | Passed | ||
06/11/2024 | COT - RSPL - Backwater Valve | Passed | ||
06/11/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/21/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/21/2024 | COT - RSBU - Preslab | Passed | ||
06/21/2024 | COT - RSEL - Electrical Underground | Passed | ||
06/21/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
07/19/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/19/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/29/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/29/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/11/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall is properly secured to studs per shear wall detail on plan. Okay to proceed with tape, texture, and paint. | |
10/02/2024 | COT - RSPL - Sewer | Passed | ||
10/30/2024 | BULD - Electrical Clearance | Passed | 10-30-24, panel okay to be energized. | |
10/30/2024 | COT - BULD - SWG Clearance | Passed | 10-30-24, approved for Southwest Gas connection. | |
11/15/2024 | COT - RSEL - Electrical Final | Passed | 11/15/24 pass | |
11/15/2024 | COT - RSEL - Outdoor Lighting | Passed | 11/15/24 pass | |
11/15/2024 | COT - RSPL - Plumbing Final | Passed | 11/15/24 pass | |
11/15/2024 | ENGR Engineering Final | Passed | CO Ready | |
11/20/2024 | COT - RSME - Mechanical Final | Passed | 11/20/24: above noted items have been corrected. Okay to issue Certificate of Occupancy. | |
11/20/2024 | RSBU - Building Final | Passed | 11/20/24: above noted items have been corrected. Okay to issue Certificate of Occupancy. |