Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
04/01/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2212-230 T22-M0018

Permit Reviews

Permit Number - TC-MDP-0124-00105
Permit Status: Inspections complete
Permit Description: SFR BT2212-230 T22-M0018
Start Date Submittal Complete Date Status  
04/01/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/05/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00105
Permit Status: Inspections complete
Permit Description: SFR BT2212-230 T22-M0018
Total Outstanding Activity Conditions - 6
Date Name
01/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
01/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/03/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/03/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/03/2024 Post-Tension Inspection Report is required.
04/03/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0124-00105
Permit Status: Inspections complete
Permit Description: SFR BT2212-230 T22-M0018
Date Description Comments
01/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00105
Permite Description: SFR BT2212-230 T22-M0018
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/15/2024 COT - RSEL - Electrical Underground N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00105
Permit Description: SFR BT2212-230 T22-M0018
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/30/2024 COT - RSPL - Yard Water Line Passed
05/01/2024 COT - RSPL - Rough Soil Passed 5/1/24: Underground plumbing is complete and under a water test with no leaks. Okay to shade pipe and backfill trenches.
05/15/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/15/2024 COT - RSBU - Preslab Passed
05/15/2024 COT - RSEL - Grounding/Bonding Passed
06/17/2024 COT - RSBU - Exterior Clips/Sheathing Passed All plywood sheathing is properly installed and secured to the studs per plan requirements. All shear wall hold downs are installed and properly nailed off. All masa clips are secured to bottom plate with nails, were needed bottom plate is secured with titan bolts, red heads, or shot pins. Okay to proceed with rough-in of mechanical, electrical, and plumbing work.
06/17/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly installed and secured to top plate with nails and H2.5 clips. Roof sheathing is properly nailed per plan and code. Okay to proceed with rough-in of mechanical, electrical, and plumbing.
07/19/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/19/2024 COT - RSPL - Gas Pressure Test Passed
08/16/2024 COT - RSBU - Interior Shear Bracing Passed Interior shear walls drywall is properly secured to studs with screws per plan requirements. Okay to proceed with tape, texture, and painting of interior walls and ceilings.
09/19/2024 COT - RSPL - Sewer Passed
09/19/2024 COT - RSPL - Backwater Valve Passed
10/09/2024 COT - BULD - SWG Clearance Passed SWG Clearance issued to Southwest Gas Company.
10/15/2024 BULD - Electrical Clearance Passed TEP ECO
10/25/2024 COT - RSEL - Electrical Final Passed Construction is completed per plans. Okay to issue Certificate of Occupancy.
10/25/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is installed and operational per plan and city requirements.
10/25/2024 COT - RSME - Mechanical Final Passed Construction is completed per plans. Okay to issue Certificate of Occupancy.
10/25/2024 COT - RSPL - Plumbing Final Passed Construction is completed per plans. Okay to issue Certificate of Occupancy.
10/25/2024 ENGR Engineering Final Passed paint abs turn down on south side of SFR
10/25/2024 RSBU - Building Final Passed Construction is completed per plans. Okay to issue Certificate of Occupancy.
10/25/2024 RSBU - Building Progress Passed Construction is completed per plans. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 41 REVISED START_V1.PDF DOCUMENTS VIEW
BTIII 41 SIC-2024-04-01_V1.PDF DOCUMENTS VIEW