Permit: TC-MDP-0124-00104
Permit Details
Apply Date:
02/14/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2212-230 T22-M0018
Permit Reviews
Permit Number - TC-MDP-0124-00104
Permit Status: Inspections complete
Permit Description: SFR BT2212-230 T22-M0018
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/14/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/16/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00104
Permit Status: Inspections complete
Permit Description: SFR BT2212-230 T22-M0018
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
01/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
02/14/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
02/14/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
02/16/2024 | Post-Tension Inspection Report is required. |
02/16/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
11/22/2023 | THIS DOES NOT APPLY |
Conditions
Permit Number - TC-MDP-0124-00104
Permit Status: Inspections complete
Permit Description: SFR BT2212-230 T22-M0018
Date | Description | Comments |
---|---|---|
01/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
11/22/2023 | THIS DOES NOT APPLY |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00104
Permite Description: SFR BT2212-230 T22-M0018
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/05/2024 | COT - RSEL - Electrical Underground | N/A | Not Applicable | Not required on this model, kitchen has a peninsula not an island. |
05/08/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | Missing a/b bolts in 5 different places on shear walls throughout house. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00104
Permit Description: SFR BT2212-230 T22-M0018
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/19/2024 | COT - RSPL - Yard Water Line | Passed | ||
04/05/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are in place, post tension cabling is properly installed per plans, rebar reinforcement is installed where required by the plan, Ufer ground rebar is attached to bottom rebar in footing, and footings are properly dug out and cleaned of debris. | |
04/05/2024 | COT - RSBU - Preslab | Passed | Concrete forms are in place, post tension cabling is properly installed per plans, rebar reinforcement is installed where required by the plan, Ufer ground rebar is attached to bottom rebar in footing, and footings are properly dug out and cleaned of debris. | |
04/05/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are in place, post tension cabling is properly installed per plans, rebar reinforcement is installed where required by the plan, Ufer ground rebar is attached to bottom rebar in footing, and footings are properly dug out and cleaned of debris. | |
05/08/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly installed and secured to top plate with H2.5 clips. Roof sheathing is properly nailed to trusses per code. Okay to proceed with top out of plumbing. | |
05/10/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 5-10-24: Missing A/B bolts have been installed on all shear walls. Okay to proceed. | |
06/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall throughout. | |
06/12/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15# of air pressure with no leaks. Okay to proceed. | |
07/05/2024 | COT - RSBU - Interior Shear Bracing | Passed | 7/5/24: Sheet rock on interior shear walls is properly secured to studs per the plan. Okay to proceed with tape, texture, and paint. | |
08/02/2024 | BULD - Electrical Clearance | Passed | TEP issued an ECO Clearance. Okay to energize panel. | |
08/06/2024 | COT - RSPL - Sewer | Passed | ||
08/06/2024 | COT - RSPL - Rough Soil | Passed | ||
08/27/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter connection only | |
09/25/2024 | COT - RSEL - Electrical Final | Passed | ||
09/25/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
09/25/2024 | COT - RSME - Mechanical Final | Passed | ||
09/25/2024 | COT - RSPL - Plumbing Final | Passed | ||
09/27/2024 | ENGR Engineering Final | Passed | ||
09/25/2024 | RSBU - Building Final | Passed | ||
09/25/2024 | RSBU - Building Progress | Passed |