Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
01/17/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2212-230 T22-M0018

Permit Reviews

Permit Number - TC-MDP-0124-00103
Permit Status: Inspections complete
Permit Description: SFR BT2212-230 T22-M0018
Start Date Submittal Complete Date Status  
01/18/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/24/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00103
Permit Status: Inspections complete
Permit Description: SFR BT2212-230 T22-M0018
Total Outstanding Activity Conditions - 5
Date Name
01/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
01/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/18/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/23/2024 Post-Tension Inspection Report is required.
01/23/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0124-00103
Permit Status: Inspections complete
Permit Description: SFR BT2212-230 T22-M0018
Date Description Comments
01/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00103
Permit Description: SFR BT2212-230 T22-M0018
Total Completed Inspections - 22
Date Description Inspector Results Comments
01/29/2024 COT - RSPL - Yard Water Line Passed
01/29/2024 COT - RSPL - Rough Soil Passed
01/29/2024 COT - RSPL - Sewer Passed
02/05/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/05/2024 COT - RSBU - Preslab Passed
02/05/2024 COT - RSEL - Electrical Underground Passed
02/05/2024 COT - RSEL - Grounding/Bonding Passed
02/28/2024 COT - RSBU - Exterior Clips/Sheathing Passed 2/28/24: all corrections made.
02/28/2024 COT - RSBU - Roof Nailing Passed 2/28/24: all corrections made.
03/25/2024 COT - RSPL - Gas Pressure Test Passed 3/25/24: gas line is holding 15 pounds of compressed air and no leaks. Okay to proceed.
03/25/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 3/25/24: Mechanical, plumbing, and electrical rough-in is complete. Okay to proceed with installation of insulation and drywall.
04/15/2024 COT - RSBU - Interior Shear Bracing Passed
05/03/2024 BULD - Electrical Clearance Passed TEP eco
05/23/2024 COT - BULD - SWG Clearance Passed SWG for meter only
06/21/2024 COT - RSEL - Electrical Final Passed
06/21/2024 COT - RSEL - Outdoor Lighting Passed
06/21/2024 COT - RSME - Mechanical Final Passed
06/21/2024 COT - RSPL - Backwater Valve Passed
06/21/2024 COT - RSPL - Plumbing Final Passed
06/21/2024 RSBU - Building Progress Passed
06/21/2024 ENGR Engineering Final Passed
06/21/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA 88 SIC-2024-01-18_V1.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 1 - LOT 88 START_V1.PDF DOCUMENTS VIEW