Permit: TC-MDP-0124-00101
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4735 S VERDIN VALLEY DR
Address NEW:
4735 S VERDIN VALLEY DR
Apply Date:
01/17/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1262-130 T22-M0016
Permit Reviews
Permit Number - TC-MDP-0124-00101
Permit Status: Complete
Permit Description: SFR BT1262-130 T22-M0016
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/09/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 01/09/2026 | APPROVED |
| 01/09/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/09/2026 | REQUIRES RESUBMIT |
| 03/17/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/26/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00101
Permit Status: Complete
Permit Description: SFR BT1262-130 T22-M0016
| Date | Description | Comments |
|---|---|---|
| 03/17/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 03/24/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 03/24/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 01/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 03/25/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00101
Permit Description: SFR BT1262-130 T22-M0016
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2025 | COT - RSPL - Sewer | Passed | Passed 4/1/25 ok to backfill | |
| 04/01/2025 | COT - RSPL - Rough Soil | Passed | Passed 4/1/25 ok to backfill | |
| 04/08/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 4/8/25 ok to pour concrete | |
| 04/08/2025 | COT - RSBU - Preslab | Passed | Passed 4/8/25 ok to pour concrete | |
| 04/08/2025 | COT - RSEL - Electrical Underground | Passed | Passed, ok to pour concrete | |
| 04/24/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4/24/25 corrections made | |
| 04/24/2025 | COT - RSBU - Roof Nailing | Passed | 4/24/25 corrections made | |
| 05/06/2025 | BULD - Electrical Clearance | Passed | Ready for temp power CLEARANCE ECO | |
| 05/08/2025 | COT - RSEL - Grounding/Bonding | Passed | Passed 5/8/25 | |
| 05/08/2025 | COT - RSPL - Yard Water Line | Passed | Passed 5/8/25 | |
| 05/08/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 5/8/25 | |
| 05/08/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed 5/8/25 | |
| 05/21/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 5/21/25 | |
| 06/27/2025 | COT - BULD - SWG Clearance | Passed | 6/27/25 SOUTHWEST GAS CLEARANCE: SWG |
|
| 07/08/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 7/8/25 | |
| 07/08/2025 | COT - RSEL - Electrical Final | Passed | Passed final 7/8/25 | |
| 07/08/2025 | COT - RSME - Mechanical Final | Passed | Passed final 7/8/25 | |
| 07/08/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 7/8/25 | |
| 07/08/2025 | ENGR Engineering Final | Passed | Site is complete according to approved plans. CofO ready. | |
| 07/08/2025 | RSBU - Building Final | Passed | Passed final 7/8/25 | |
| 07/08/2025 | RSBU - Building Progress | Passed | Passed final 7/8/25 |