Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/17/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1262-130 T22-M0016

Permit Reviews

Permit Number - TC-MDP-0124-00101
Permit Status: Complete
Permit Description: SFR BT1262-130 T22-M0016
Start Date Submittal Complete Date Status  
01/09/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/09/2026 APPROVED Review Details
01/09/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/09/2026 REQUIRES RESUBMIT Review Details
03/17/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 03/26/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0124-00101
Permit Status: Complete
Permit Description: SFR BT1262-130 T22-M0016
Date Description Comments
03/17/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
03/24/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/24/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/25/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00101
Permit Description: SFR BT1262-130 T22-M0016
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/01/2025 COT - RSPL - Sewer Passed Passed 4/1/25 ok to backfill
04/01/2025 COT - RSPL - Rough Soil Passed Passed 4/1/25 ok to backfill
04/08/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 4/8/25 ok to pour concrete
04/08/2025 COT - RSBU - Preslab Passed Passed 4/8/25 ok to pour concrete
04/08/2025 COT - RSEL - Electrical Underground Passed Passed, ok to pour concrete
04/24/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 4/24/25 corrections made
04/24/2025 COT - RSBU - Roof Nailing Passed 4/24/25 corrections made
05/06/2025 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO
05/08/2025 COT - RSEL - Grounding/Bonding Passed Passed 5/8/25
05/08/2025 COT - RSPL - Yard Water Line Passed Passed 5/8/25
05/08/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 5/8/25
05/08/2025 COT - RSPL - Gas Pressure Test Passed Passed 5/8/25
05/21/2025 COT - RSBU - Interior Shear Bracing Passed Passed 5/21/25
06/27/2025 COT - BULD - SWG Clearance Passed 6/27/25
SOUTHWEST GAS CLEARANCE: SWG
07/08/2025 COT - RSEL - Outdoor Lighting Passed Passed final 7/8/25
07/08/2025 COT - RSEL - Electrical Final Passed Passed final 7/8/25
07/08/2025 COT - RSME - Mechanical Final Passed Passed final 7/8/25
07/08/2025 COT - RSPL - Plumbing Final Passed Passed final 7/8/25
07/08/2025 ENGR Engineering Final Passed Site is complete according to approved plans. CofO ready.
07/08/2025 RSBU - Building Final Passed Passed final 7/8/25
07/08/2025 RSBU - Building Progress Passed Passed final 7/8/25

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 59 START_V1.PDF DOCUMENTS VIEW
BTIII 59 SIC-2025-03-14_V1.PDF DOCUMENTS VIEW