Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
12/18/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1262-130 T22-M0016 (Model master plan TC-MDP-1222-00157)

Permit Reviews

Permit Number - TC-MDP-0124-00099
Permit Status: Inspections
Permit Description: SFR BT1262-130 T22-M0016 (Model master plan TC-MDP-1222-00157)
Start Date Submittal Complete Date Status  
12/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/06/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00099
Permit Status: Inspections
Permit Description: SFR BT1262-130 T22-M0016 (Model master plan TC-MDP-1222-00157)
Total Outstanding Activity Conditions - 3
Date Name
01/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
12/27/2024 Post-Installed Anchor Inspection Report is required.
12/27/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0124-00099
Permit Status: Inspections
Permit Description: SFR BT1262-130 T22-M0016 (Model master plan TC-MDP-1222-00157)
Date Description Comments
12/26/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0124-00099
Permite Description: SFR BT1262-130 T22-M0016 (Model master plan TC-MDP-1222-00157)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/29/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 1/29/25 partial pass, ufer is set.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0124-00099
Permit Description: SFR BT1262-130 T22-M0016 (Model master plan TC-MDP-1222-00157)
Total Completed Inspections - 6
Date Description Inspector Results Comments
01/22/2025 COT - RSPL - Sewer Passed 1/22/25 pass
01/22/2025 COT - RSPL - Yard Water Line Passed 1/22/25 pass
01/22/2025 COT - RSPL - Rough Soil Passed 1/22/25 pass
01/29/2025 COT - RSEL - Electrical Underground Passed 1/29/25 pass
01/29/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 1/29/25 pass
01/29/2025 COT - RSBU - Preslab Passed 1/29/25 pass

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 14 START_V1.PDF DOCUMENTS VIEW
BTIII 14 SIC-2024-12-18_V1.PDF DOCUMENTS VIEW