Permit: TC-MDP-0124-00099
Permit Details
Apply Date:
12/18/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1262-130 T22-M0016 (Model master plan TC-MDP-1222-00157)
Permit Reviews
Permit Number - TC-MDP-0124-00099
Permit Status: Inspections
Permit Description: SFR BT1262-130 T22-M0016 (Model master plan TC-MDP-1222-00157)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/27/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/06/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00099
Permit Status: Inspections
Permit Description: SFR BT1262-130 T22-M0016 (Model master plan TC-MDP-1222-00157)
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
01/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
12/27/2024 | Post-Installed Anchor Inspection Report is required. |
12/27/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0124-00099
Permit Status: Inspections
Permit Description: SFR BT1262-130 T22-M0016 (Model master plan TC-MDP-1222-00157)
Date | Description | Comments |
---|---|---|
12/26/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
01/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0124-00099
Permite Description: SFR BT1262-130 T22-M0016 (Model master plan TC-MDP-1222-00157)
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/29/2025 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | 1/29/25 partial pass, ufer is set. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0124-00099
Permit Description: SFR BT1262-130 T22-M0016 (Model master plan TC-MDP-1222-00157)
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/22/2025 | COT - RSPL - Sewer | Passed | 1/22/25 pass | |
01/22/2025 | COT - RSPL - Yard Water Line | Passed | 1/22/25 pass | |
01/22/2025 | COT - RSPL - Rough Soil | Passed | 1/22/25 pass | |
01/29/2025 | COT - RSEL - Electrical Underground | Passed | 1/29/25 pass | |
01/29/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 1/29/25 pass | |
01/29/2025 | COT - RSBU - Preslab | Passed | 1/29/25 pass |