Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
02/06/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1262-130 T22-M0016

Permit Reviews

Permit Number - TC-MDP-0124-00095
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Start Date Submittal Complete Date Status  
02/06/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/13/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00095
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Total Outstanding Activity Conditions - 6
Date Name
01/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
02/06/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/06/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/13/2024 Post-Tension Inspection Report is required.
02/13/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
11/22/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0124-00095
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Date Description Comments
01/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00095
Permite Description: SFR BT1262-130 T22-M0016
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
03/28/2024 COT - RSEL - Electrical Underground N/A Not Applicable
03/28/2024 COT - RSEL - Grounding/Bonding N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00095
Permit Description: SFR BT1262-130 T22-M0016
Total Completed Inspections - 19
Date Description Inspector Results Comments
03/19/2024 COT - RSPL - Yard Water Line Passed
03/28/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
03/28/2024 COT - RSBU - Preslab Passed
04/17/2024 COT - RSBU - Roof Nailing Passed
04/19/2024 COT - RSBU - Exterior Clips/Sheathing Passed 4-19-24: Missing bolts have been installed on both sides of garage door and bedroom #3 shear wall. Nails have been added to RSP Clip at front entry.
05/10/2024 COT - RSPL - Gas Pressure Test Passed Gas line is holding 15#of compressed air with no leaks. Okay to proceed.
05/15/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5/15/24: all corrections made
06/14/2024 COT - RSBU - Interior Shear Bracing Passed
07/22/2024 COT - RSPL - Sewer Passed Underground plumbing is connected to sewer and under a water pressure test with no leaks in piping or joints. Okay to shade pipe and backfill trench.
07/22/2024 COT - RSPL - Rough Soil Passed Underground plumbing is connected to sewer and under a water pressure test with no leaks in piping or joints. Okay to shade pipe and backfill trench.
07/24/2024 BULD - Electrical Clearance Passed Okay to energize panel. ECO Clearance issued to TEP for 9123 E. Red Bluff Ct.
08/08/2024 COT - BULD - SWG Clearance Passed SWG for meter only
09/17/2024 COT - RSEL - Outdoor Lighting Passed
09/17/2024 ENGR Engineering Final Passed
09/17/2024 RSBU - Building Progress Passed
09/18/2024 COT - RSEL - Electrical Final Passed
09/18/2024 COT - RSME - Mechanical Final Passed
09/18/2024 COT - RSPL - Plumbing Final Passed
09/18/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 29 START_V1.PDF DOCUMENTS VIEW
BTIII 29 SIC-2024-02-06_V1.PDF DOCUMENTS VIEW