Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
01/17/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1262-130 T22-M0016

Permit Reviews

Permit Number - TC-MDP-0124-00094
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Start Date Submittal Complete Date Status  
02/01/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/06/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00094
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Total Outstanding Activity Conditions - 5
Date Name
01/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
02/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/01/2024 Post-Tension Inspection Report is required.
02/01/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0124-00094
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Date Description Comments
01/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00094
Permit Description: SFR BT1262-130 T22-M0016
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/29/2024 COT - RSPL - Yard Water Line Passed
02/29/2024 COT - RSPL - Rough Soil Passed
02/29/2024 COT - RSPL - Sewer Passed
03/06/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
03/06/2024 COT - RSBU - Preslab Passed
03/06/2024 COT - RSEL - Electrical Underground Passed
03/06/2024 COT - RSEL - Grounding/Bonding Passed
04/01/2024 COT - RSBU - Exterior Clips/Sheathing Passed All bolts are properly installed, all clips for bottom plates are nailed to plate, all shear wall sheathing is properly nailed and secured to studs, and all rafters have h2.5 clips properly nailed to top plate. Okay to proceed with dry-in and stucco foam and lath application.
04/01/2024 COT - RSBU - Roof Nailing Passed Roof sheathing is properly nailed off, every rafter has a h2.5 clip holding it down to the top plate and is properly nailed. Okay to proceed with dry-in of roof.
05/02/2024 BULD - Electrical Clearance Passed
05/03/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/03/2024 COT - RSPL - Gas Pressure Test Passed
05/17/2024 COT - RSBU - Interior Shear Bracing Passed Drywall is properly installed and secured to studs per shear wall detail in plans. Okay to proceed with tape, texture, and paint of walls and ceilings.
07/12/2024 COT - BULD - SWG Clearance Passed Gas valves are installed at all gas appliance locations. SWG Clearance issued for this project.
07/12/2024 RSBU - Building Progress Passed Project is in punch list, working on getting ready for final inspections.
07/19/2024 COT - RSEL - Outdoor Lighting Passed
07/19/2024 COT - RSEL - Electrical Final Passed
07/19/2024 COT - RSME - Mechanical Final Passed
07/19/2024 COT - RSPL - Plumbing Final Passed
07/19/2024 RSBU - Building Final Passed
07/19/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 2 - LOT 73 START_V1.PDF DOCUMENTS VIEW
BTII 73 SIC-2024-02-01_V1.PDF DOCUMENTS VIEW