Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
7564 S CELINA WY
Apply Date:
01/16/2024
Applicant:
Kelly Rayman
Description:
Blackhawk H30A Model Plan

Permit Reviews

Permit Number - TC-MDP-0124-00088
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Start Date Submittal Complete Date Status  
01/17/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/23/2024 APPROVED Review Details
04/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/19/2024 APPROVED Review Details
02/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/01/2024 APPROVED Review Details
04/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/12/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00088
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Total Outstanding Activity Conditions - 1
Date Name
01/16/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0124-00088
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Date Description Comments
01/23/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/17/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/17/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/01/2024 Post-Tension Inspection Report is required.
09/05/2023 Post-Tension Inspection Report is required.
01/12/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/12/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/01/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/05/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00088
Permit Description: Blackhawk H30A Model Plan
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/21/2024 COT - RSPL - Rough Soil Passed
02/21/2024 COT - RSPL - Sewer Passed
02/21/2024 COT - RSPL - Yard Water Line Passed
02/29/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/29/2024 COT - RSBU - Preslab Passed
02/29/2024 COT - RSEL - Electrical Underground Passed
02/29/2024 COT - RSEL - Grounding/Bonding Passed
03/06/2024 COT - RSBU - Exterior Clips/Sheathing Passed
03/06/2024 COT - RSBU - Roof Nailing Passed
03/21/2024 BULD - Electrical Clearance Passed
03/21/2024 COT - RSPL - Gas Pressure Test Passed
03/22/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/01/2024 COT - RSBU - Interior Shear Bracing Passed
05/09/2024 COT - BULD - SWG Clearance Passed
05/15/2024 COT - RSEL - Electrical Final Passed
05/15/2024 COT - RSEL - Outdoor Lighting Passed
05/15/2024 COT - RSME - Mechanical Final Passed
05/15/2024 COT - RSPL - Plumbing Final Passed
05/15/2024 ENGR Engineering Final Passed 1) Please remove all nursery stakes from planted trees, I removed the twist ties on this one.
2) Ensure that the clean outs in the front yards stay as they have been in the 1st three homes and do not become a trip hazard.
3) Keep a close eye on grades to ensure that drainage is positive away from the home and that there is a 6 inch barrier between finished grade and siding.
05/15/2024 RSBU - Building Final Passed
05/15/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
BHK 151 PT REPORT_V1ORIGIN_V1.PDF DOCUMENTS VIEW
BHK 151 SIC-2024-04-18_V1.PDF DOCUMENTS VIEW
BHK 151 PT REPORT_V1.PDF DOCUMENTS VIEW
BHK 151 SIC-2024-04-11_V1.PDF DOCUMENTS VIEW
BHK 151 REV1 NARRATIVE_V2_V1.PDF DOCUMENTS VIEW
BHK 151 REV1 SIC-2024-02-19_V2-2024-03-01_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 151 D1_V1.PDF DOCUMENTS VIEW
BHK 151 SIC-2024-01-16_V1.PDF DOCUMENTS VIEW