Permit: TC-MDP-0124-00088
Permit Details
Apply Date:
01/16/2024
Applicant:
Kelly Rayman
Description:
Blackhawk H30A Model Plan
Permit Reviews
Permit Number - TC-MDP-0124-00088
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/17/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/23/2024 | APPROVED |
04/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/19/2024 | APPROVED |
02/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/01/2024 | APPROVED |
04/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/12/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00088
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
01/16/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0124-00088
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Date | Description | Comments |
---|---|---|
01/23/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
01/17/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/17/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/01/2024 | Post-Tension Inspection Report is required. | |
09/05/2023 | Post-Tension Inspection Report is required. | |
01/12/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/12/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
03/01/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
09/05/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00088
Permit Description: Blackhawk H30A Model Plan
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/21/2024 | COT - RSPL - Rough Soil | Passed | ||
02/21/2024 | COT - RSPL - Sewer | Passed | ||
02/21/2024 | COT - RSPL - Yard Water Line | Passed | ||
02/29/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
02/29/2024 | COT - RSBU - Preslab | Passed | ||
02/29/2024 | COT - RSEL - Electrical Underground | Passed | ||
02/29/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
03/06/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
03/06/2024 | COT - RSBU - Roof Nailing | Passed | ||
03/21/2024 | BULD - Electrical Clearance | Passed | ||
03/21/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
03/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
04/01/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
05/09/2024 | COT - BULD - SWG Clearance | Passed | ||
05/15/2024 | COT - RSEL - Electrical Final | Passed | ||
05/15/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
05/15/2024 | COT - RSME - Mechanical Final | Passed | ||
05/15/2024 | COT - RSPL - Plumbing Final | Passed | ||
05/15/2024 | ENGR Engineering Final | Passed | 1) Please remove all nursery stakes from planted trees, I removed the twist ties on this one. 2) Ensure that the clean outs in the front yards stay as they have been in the 1st three homes and do not become a trip hazard. 3) Keep a close eye on grades to ensure that drainage is positive away from the home and that there is a 6 inch barrier between finished grade and siding. |
|
05/15/2024 | RSBU - Building Final | Passed | ||
05/15/2024 | RSBU - Building Progress | Passed |