Permit: TC-MDP-0124-00087
Permit Details
Apply Date:
01/16/2024
Applicant:
Kelly Rayman
Description:
Blackhawk H30A Model Plan
Permit Reviews
Permit Number - TC-MDP-0124-00087
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/02/2024 | APPROVED |
01/17/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/23/2024 | APPROVED |
02/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00087
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
03/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0124-00087
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Date | Description | Comments |
---|---|---|
01/23/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
01/17/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/17/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/01/2024 | Post-Tension Inspection Report is required. | |
09/05/2023 | Post-Tension Inspection Report is required. | |
01/12/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/12/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
03/01/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
09/05/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00087
Permit Description: Blackhawk H30A Model Plan
Total Completed Inspections - 21