Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
01/16/2024
Applicant:
Kelly Rayman
Description:
Blackhawk H30A Model Plan

Permit Reviews

Permit Number - TC-MDP-0124-00087
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Start Date Submittal Complete Date Status  
05/02/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/02/2024 APPROVED Review Details
01/17/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/23/2024 APPROVED Review Details
02/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00087
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Total Outstanding Activity Conditions - 1
Date Name
03/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0124-00087
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Date Description Comments
01/23/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/17/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/17/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/01/2024 Post-Tension Inspection Report is required.
09/05/2023 Post-Tension Inspection Report is required.
01/12/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/12/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/01/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/05/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00087
Permit Description: Blackhawk H30A Model Plan
Total Completed Inspections - 21

Documents

File Name Document Type  
BHK 122 SIC-2024-05-01_V1.PDF DOCUMENTS VIEW
BHK 122 REV1 NARRATIVE_V1 (2)_V1.PDF DOCUMENTS VIEW
BHK 122 REV1 SIC-2024-02-19_V2-2024-03-01_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 122 D1_V1.PDF DOCUMENTS VIEW
BHK 122 SIC-2024-01-16_V1.PDF DOCUMENTS VIEW