Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0124-00084
Permit Details
Apply Date:
01/16/2024
Applicant:
Kelly Rayman
Description:
Blackhawk H30G Model Plan
Permit Reviews
Permit Number - TC-MDP-0124-00084
Permit Status: Inspections complete
Permit Description: Blackhawk H30G Model Plan
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/06/2024 | APPROVED |
02/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/29/2024 | APPROVED |
01/17/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/23/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00084
Permit Status: Inspections complete
Permit Description: Blackhawk H30G Model Plan
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
01/16/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
01/23/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0124-00084
Permit Status: Inspections complete
Permit Description: Blackhawk H30G Model Plan
Date | Description | Comments |
---|---|---|
01/17/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/18/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/29/2024 | Post-Tension Inspection Report is required. | |
10/03/2023 | Post-Tension Inspection Report is required. | |
01/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/23/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/29/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
06/06/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
10/03/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00084
Permite Description: Blackhawk H30G Model Plan
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/15/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | Missing anchor bolts at shear walls per SGN sheathing schedule/Sill Plate Anchorage Schedule, load from second floor GTs must transfer down continuously to first floor. Studs needed at first floor and blocking needed between floors., rsp4 clips needed at front porch, remove over notched studs at garage bearing load of beam and replace with new studs, missing rsp4 clips left side of house, floor joists must be installed and secured per SD5/SD6 details., missing h2.5 clips second floor, missing nails at sole plate second floor back side of house. |
05/08/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Copper wire not connected to ufer. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00084
Permit Description: Blackhawk H30G Model Plan
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/07/2024 | BULD - Electrical Clearance | Passed | ||
03/07/2024 | COT - RSPL - Rough Soil | Passed | ||
03/07/2024 | COT - RSPL - Sewer | Passed | ||
03/07/2024 | COT - RSPL - Yard Water Line | Passed | ||
03/15/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
03/15/2024 | COT - RSBU - Preslab | Passed | ||
03/15/2024 | COT - RSEL - Electrical Underground | Passed | ||
03/15/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
05/07/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | House has proceeded to intermediate. Some corrections can not be fully seen/exposed. Superintendent Tito understands and accepts that proceeding will be at his own risk. | |
05/07/2024 | COT - RSBU - Roof Nailing | Passed | ||
05/08/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
05/09/2024 | COT - BULD - SWG Clearance | Passed | ||
05/22/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
07/11/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
07/11/2024 | COT - RSME - Mechanical Final | Passed | ||
07/11/2024 | COT - RSPL - Plumbing Final | Passed | ||
07/11/2024 | ENGR Engineering Final | Passed | ||
07/11/2024 | RSBU - Building Progress | Passed | ||
07/15/2024 | COT - RSEL - Electrical Final | Passed | Correction was made. 7/15/2024 | |
07/15/2024 | RSBU - Building Final | Passed |