Permit: TC-MDP-0124-00082
Permit Details
Apply Date:
01/16/2024
Applicant:
Kelly Rayman
Description:
Blackhawk H30G Model Plan
Permit Reviews
Permit Number - TC-MDP-0124-00082
Permit Status: Inspections complete
Permit Description: Blackhawk H30G Model Plan
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/29/2024 | APPROVED |
01/17/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/23/2024 | APPROVED |
02/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/29/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00082
Permit Status: Inspections complete
Permit Description: Blackhawk H30G Model Plan
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
01/12/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
04/29/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0124-00082
Permit Status: Inspections complete
Permit Description: Blackhawk H30G Model Plan
Date | Description | Comments |
---|---|---|
01/17/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/17/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/29/2024 | Post-Tension Inspection Report is required. | |
10/03/2023 | Post-Tension Inspection Report is required. | |
01/12/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/29/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
10/03/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00082
Permite Description: Blackhawk H30G Model Plan
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/24/2024 | ENGR Engineering Final | N/A | Not Ready | Clean outs need to be cut. Gate not installed, wall drains incomplete, finish grade near condenser-water will pond |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00082
Permit Description: Blackhawk H30G Model Plan
Total Completed Inspections - 21