Permit: TC-MDP-0124-00063
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
2429 S CLOVIS PL
Address NEW:
2429 S CLOVIS PL
Apply Date:
01/25/2024
Applicant:
Description:
SFR PANT2022 T22-M0073 Pantano Vista Lots 1-32
Permit Reviews
Permit Number - TC-MDP-0124-00063
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073 Pantano Vista Lots 1-32
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/30/2024 | APPROVED |
| 04/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/16/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00063
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073 Pantano Vista Lots 1-32
| Date | Description | Comments |
|---|---|---|
| 12/12/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/10/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 01/10/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 01/26/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00063
Permite Description: SFR PANT2022 T22-M0073 Pantano Vista Lots 1-32
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2024 | COT - RSEL - Grounding/Bonding | N/A | Not Applicable | |
| 08/26/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | Not Applicable--No Gas onsite. |
| 04/07/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | site does not use gas |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00063
Permit Description: SFR PANT2022 T22-M0073 Pantano Vista Lots 1-32
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 03/14/2024 | COT - RSPL - Rough Soil | Passed | ||
| 03/14/2024 | COT - RSPL - Sewer | Passed | ||
| 03/14/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 04/08/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/08/2024 | COT - RSBU - Preslab | Passed | ||
| 05/31/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/31/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 06/17/2024 | COT - RSEL - Electrical Underground | Passed | Sweep and conduit are properly secured to electrical panel and ran out to TEP's transformer. Okay to shade conduit and backfill trench. | |
| 06/21/2024 | BULD - Electrical Clearance | Passed | ||
| 08/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/26/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall is properly installed and secured to the studs. | |
| 02/20/2025 | COT - RSEL - Outdoor Lighting | Passed | 2-20-25, approved | |
| 04/07/2025 | COT - RSEL - Electrical Final | Passed | Passed final 4/7/25 | |
| 04/07/2025 | COT - RSME - Mechanical Final | Passed | Passed final 4/7/25 | |
| 04/07/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/7/25 | |
| 04/07/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 04/07/2025 | RSBU - Building Final | Passed | Passed final 4/7/25 | |
| 04/07/2025 | RSBU - Building Progress | Passed | Passed final 4/7/25 |