Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0124-00061
Permit Details
Apply Date:
01/10/2024
Applicant:
Garland Shaw
Description:
SFR PANT2022 T22-M0073 Pantano Vista Lots 1-32
Permit Reviews
Permit Number - TC-MDP-0124-00061
Permit Status: In review
Permit Description: SFR PANT2022 T22-M0073 Pantano Vista Lots 1-32
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/28/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/29/2024 | APPROVED |
01/10/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 01/24/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00061
Permit Status: In review
Permit Description: SFR PANT2022 T22-M0073 Pantano Vista Lots 1-32
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
01/10/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
02/29/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
02/29/2024 | Post-Tension Inspection Report is required. |
12/12/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0124-00061
Permit Status: In review
Permit Description: SFR PANT2022 T22-M0073 Pantano Vista Lots 1-32
Date | Description | Comments |
---|---|---|
01/10/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: In Review
Permit Number: TC-MDP-0124-00061
Permite Description: SFR PANT2022 T22-M0073 Pantano Vista Lots 1-32
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/13/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
08/13/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: In Review
Permit Number: TC-MDP-0124-00061
Permit Description: SFR PANT2022 T22-M0073 Pantano Vista Lots 1-32
Total Completed Inspections - 14
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/25/2024 | COT - RSPL - Backwater Valve | Passed | ||
04/25/2024 | COT - RSPL - Rough Soil | Passed | ||
04/25/2024 | COT - RSPL - Sewer | Passed | ||
04/25/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/10/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
05/10/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
05/10/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
06/11/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
06/11/2024 | COT - RSBU - Roof Nailing | Passed | ||
06/17/2024 | COT - RSEL - Electrical Underground | Passed | Sweep and conduit are properly secured to electrical panel and ran out to TEP's transformer. Okay to shade conduit and backfill trench. | |
06/21/2024 | BULD - Electrical Clearance | Passed | ||
08/01/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 8/1/2024 | |
08/13/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/15/2024 | RSBU - Building Progress | Passed |