Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/27/2024
Applicant:
Daria Hopkins
Description:
SFR MERI156021 T21-M0063

Permit Reviews

Permit Number - TC-MDP-0124-00053
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Start Date Submittal Complete Date Status  
10/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/16/2024 APPROVED Review Details
02/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/08/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0124-00053
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Date Description Comments
03/06/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/06/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/06/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/06/2024 Post-Installed Anchor Inspection Report is required.
03/06/2024 Post-Tension Inspection Report is required.
01/09/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/09/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/06/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/06/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00053
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/15/2024 COT - RSPL - Backwater Valve Passed 5/15/24: passed. Ok to backfill. Shading required
05/15/2024 COT - RSPL - Sewer Passed 5/15/24: passed. Ok to backfill. Shading required
05/15/2024 COT - RSPL - Rough Soil Passed 5/15/24: passed. Ok to backfill. Shading required
05/15/2024 COT - RSPL - Yard Water Line Passed 5/15/24: passed. Ok to backfill. Shading required
05/29/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/29/2024 COT - RSBU - Preslab Passed
05/29/2024 COT - RSEL - Electrical Underground Passed
05/29/2024 COT - RSEL - Grounding/Bonding Passed
06/26/2024 COT - RSBU - Roof Nailing Passed
07/10/2024 COT - RSBU - Exterior Clips/Sheathing Passed
07/25/2024 COT - RSPL - Gas Pressure Test Passed
07/25/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 7/25/2024
07/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/07/2024 COT - RSBU - Interior Shear Bracing Passed
10/04/2024 COT - BULD - SWG Clearance Passed Corrections were made. 10/4/2024

Clearance for southwest gas. 10/4/2024
10/11/2024 COT - RSEL - Electrical Final Passed 10/11/24 PASS
10/11/2024 COT - RSEL - Outdoor Lighting Passed 10/11/24 PASS
10/11/2024 COT - RSME - Mechanical Final Passed 10/11/24 PASS
10/11/2024 COT - RSPL - Plumbing Final Passed 10/11/24 pass
10/11/2024 ENGR Engineering Final Passed CO Ready
Clean out collars are not glued
10/11/2024 RSBU - Building Final Passed 10/11/24 PASS
10/11/2024 RSBU - Building Progress Passed 10/11/24 PASS

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 151 FINAL SIC-2024-10-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 151 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 151 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 151 SPECIAL INSPECTION CERTIFICATE-2024-02-27_V1.PDF DOCUMENTS VIEW