Permit: TC-MDP-0124-00051
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4890 E GREENWAY WASH DR
Address NEW:
4890 E GREENWAY WASH DR
Apply Date:
02/13/2024
Applicant:
Description:
SFR MERI156021 T21-M0063
Permit Reviews
Permit Number - TC-MDP-0124-00051
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/13/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/16/2024 | APPROVED |
| 07/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/31/2024 | APPROVED |
| 10/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/28/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00051
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
| Date | Description | Comments |
|---|---|---|
| 02/13/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 02/13/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 02/13/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 02/16/2024 | Post-Tension Inspection Report is required. | |
| 07/31/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 01/09/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 02/13/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 07/31/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00051
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 06/09/2024 | COT - RSPL - Sewer | Passed | ||
| 06/09/2024 | COT - RSPL - Rough Soil | Passed | ||
| 06/17/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/17/2024 | COT - RSBU - Preslab | Passed | ||
| 06/17/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 06/17/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/28/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 07/11/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Corrections were made. 7/11/2024 | |
| 07/26/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 07/30/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 7/30/2024 | |
| 07/31/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/12/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 09/25/2024 | COT - BULD - SWG Clearance | Passed | PASSED SW GAS CLEARANCE 9/25/24 | |
| 10/14/2024 | COT - RSEL - Electrical Final | Passed | Passed final inspection 10/14/24 CLEARANCE ECO | |
| 10/14/2024 | COT - RSEL - Outdoor Lighting | Passed | Passed final inspection 10/14/24 | |
| 10/14/2024 | COT - RSME - Mechanical Final | Passed | Passed final inspection 10/14/24 | |
| 10/14/2024 | COT - RSPL - Plumbing Final | Passed | Passed final inspection 10/14/24 | |
| 10/14/2024 | ENGR Engineering Final | Passed | CO Ready | |
| 10/14/2024 | RSBU - Building Final | Passed | Passed final inspection 10/14/24 | |
| 10/14/2024 | RSBU - Building Progress | Passed | Passed final inspection 10/14/24 |