Permit: TC-MDP-0124-00049
Permit Details
Apply Date:
01/09/2024
Applicant:
Daria Hopkins
Description:
SFR MERI156021 T21-M0063
Permit Reviews
Permit Number - TC-MDP-0124-00049
Permit Status: Inspections complete
Permit Description: SFR MERI156021 T21-M0063
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/05/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/18/2024 | APPROVED |
10/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/15/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00049
Permit Status: Inspections complete
Permit Description: SFR MERI156021 T21-M0063
Date | Description | Comments |
---|---|---|
03/18/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
03/18/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/18/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/18/2024 | Post-Installed Anchor Inspection Report is required. | |
03/18/2024 | Post-Tension Inspection Report is required. | |
01/09/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/09/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
03/18/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
03/18/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00049
Permite Description: SFR MERI156021 T21-M0063
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/22/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | 7/22/24: check all roof nailing. Add anchor bolts where masa clips have more than 1 leg up for every 3. |
07/22/2024 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 7/22/24: check all roof nailing. Add anchor bolts where masa clips have more than 1 leg up for every 3. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00049
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/27/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 6/27/2024 | |
06/27/2024 | COT - RSPL - Sewer | Passed | ||
07/09/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/09/2024 | COT - RSBU - Preslab | Passed | ||
07/09/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/09/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
08/15/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 8/15/2024 | |
08/15/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/19/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 8/19/2024 | |
08/19/2024 | COT - RSBU - Roof Nailing | Passed | ||
08/19/2024 | COT - RSPL - Yard Water Line | Passed | ||
08/28/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/16/2024 | COT - BULD - SWG Clearance | Passed | PASSED SW GAS CLEARANCE 10/16/24 | |
10/31/2024 | COT - RSEL - Electrical Final | Passed | 10-31-24, electrical final approved. | |
10/31/2024 | COT - RSEL - Outdoor Lighting | Passed | 10-31-24, outdoor final approved. | |
10/31/2024 | COT - RSME - Mechanical Final | Passed | 10-31-24, mechanical final approved. | |
10/31/2024 | COT - RSPL - Plumbing Final | Passed | 10-31-24, plumbing final approved. | |
10/31/2024 | ENGR Engineering Final | Passed | ||
10/31/2024 | RSBU - Building Final | Passed | 10-31-24, building final approved. | |
10/31/2024 | RSBU - Building Progress | Passed |