Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0124-00048
Permit Details
Apply Date:
02/27/2024
Applicant:
Daria Hopkins
Description:
SFR MERI156021 T21-M0063
Permit Reviews
Permit Number - TC-MDP-0124-00048
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/27/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/29/2024 | APPROVED |
10/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/15/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00048
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Date | Description | Comments |
---|---|---|
02/29/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
02/29/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
02/29/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/29/2024 | Post-Tension Inspection Report is required. | |
01/09/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/15/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
01/09/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/29/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
02/29/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
10/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00048
Permite Description: SFR MERI156021 T21-M0063
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/18/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 10-18-24, pressure relieve valve shall be at 6inches above grade. Also, thermostat must be lowered to meet inclusive home requirements and correct damaged stucco near bottom of electrical panel. |
10/18/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 10-18-24, pressure relieve valve shall be at 6inches above grade. Also, thermostat must be lowered to meet inclusive home requirements and correct damaged stucco near bottom of electrical panel. |
10/18/2024 | RSBU - Building Final | N/A | Re-inspection required | 10-18-24, pressure relieve valve shall be at 6inches above grade. Also, thermostat must be lowered to meet inclusive home requirements and correct damaged stucco near bottom of electrical panel. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00048
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/14/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/14/2024 | COT - RSPL - Sewer | Passed | ||
06/14/2024 | COT - RSPL - Rough Soil | Passed | ||
06/27/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/27/2024 | COT - RSBU - Preslab | Passed | ||
06/27/2024 | COT - RSEL - Electrical Underground | Passed | ||
06/27/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
07/17/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/17/2024 | COT - RSBU - Roof Nailing | Passed | ||
08/12/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/22/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/08/2024 | BULD - Electrical Clearance | Passed | 10/8/24 electrical clearance for TEP | |
10/09/2024 | COT - BULD - SWG Clearance | Passed | 10/9/24 Southwest gas clearance. passed | |
10/18/2024 | RSBU - Building Progress | Passed | ||
10/18/2024 | COT - RSME - Mechanical Final | Passed | 10-18-24, mechanical approved. | |
10/18/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
10/23/2024 | COT - RSEL - Electrical Final | Passed | 10-23-24, final electric inspection approved. | |
10/23/2024 | COT - RSPL - Plumbing Final | Passed | 10-23-24, listed items from previous inspection corrected. Final,plumbing approved | |
10/23/2024 | ENGR Engineering Final | Passed | CO Ready | |
10/23/2024 | RSBU - Building Final | Passed | 10-23-24, final building inspection approved. |