Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0124-00046
Permit Details
Apply Date:
01/09/2024
Applicant:
Daria Hopkins
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-0124-00046
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/18/2024 | APPROVED |
02/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/06/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00046
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Date | Description | Comments |
---|---|---|
02/01/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
02/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
02/01/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/02/2024 | Post-Tension Inspection Report is required. | |
01/09/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/09/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/02/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0124-00046
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 14
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/25/2024 | COT - RSPL - Backwater Valve | Passed | ||
07/25/2024 | COT - RSPL - Rough Soil | Passed | ||
07/25/2024 | COT - RSPL - Sewer | Passed | ||
07/25/2024 | COT - RSPL - Yard Water Line | Passed | ||
08/02/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/02/2024 | COT - RSBU - Preslab | Passed | ||
08/02/2024 | COT - RSEL - Electrical Underground | Passed | ||
08/02/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
08/26/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/26/2024 | COT - RSBU - Roof Nailing | Passed | ||
09/26/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
09/26/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/30/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9/30/24: Roof is loaded, register is blocked on 3 sides, electrical box in master bathroom is supported. Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
10/09/2024 | COT - RSBU - Interior Shear Bracing | Passed | 10-9-24, Interior shear wall approved. Okay to tape & texture. |