Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
01/09/2024
Applicant:
Daria Hopkins
Description:
SFR MER1402190 T21-M0078

Permit Reviews

Permit Number - TC-MDP-0124-00046
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Start Date Submittal Complete Date Status  
09/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/18/2024 APPROVED Review Details
02/01/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/06/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0124-00046
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Date Description Comments
02/01/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/02/2024 Post-Tension Inspection Report is required.
01/09/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/09/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
02/02/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0124-00046
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 14
Date Description Inspector Results Comments
07/25/2024 COT - RSPL - Backwater Valve Passed
07/25/2024 COT - RSPL - Rough Soil Passed
07/25/2024 COT - RSPL - Sewer Passed
07/25/2024 COT - RSPL - Yard Water Line Passed
08/02/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/02/2024 COT - RSBU - Preslab Passed
08/02/2024 COT - RSEL - Electrical Underground Passed
08/02/2024 COT - RSEL - Grounding/Bonding Passed
08/26/2024 COT - RSBU - Exterior Clips/Sheathing Passed
08/26/2024 COT - RSBU - Roof Nailing Passed
09/26/2024 BULD - Electrical Clearance Passed TEP ECO
09/26/2024 COT - RSPL - Gas Pressure Test Passed
09/30/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9/30/24: Roof is loaded, register is blocked on 3 sides, electrical box in master bathroom is supported. Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall.
10/09/2024 COT - RSBU - Interior Shear Bracing Passed 10-9-24, Interior shear wall approved. Okay to tape & texture.

Documents

File Name Document Type  
149329 PT LOT 57 COMPLETE-2024-09-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 57 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 57 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 57 SPECIAL INSPECTION CERTIFICATE-2024-02-01_V1.PDF DOCUMENTS VIEW