Permit: TC-MDP-0124-00044
Permit Details
Apply Date:
01/13/2024
Applicant:
Daria Hopkins
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-0124-00044
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/16/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/23/2024 | APPROVED |
07/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/23/2024 | APPROVED |
07/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/26/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00044
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Date | Description | Comments |
---|---|---|
01/16/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
01/16/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/16/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/16/2024 | Post-Tension Inspection Report is required. | |
01/09/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/09/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
07/23/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
01/16/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00044
Permite Description: SFR MER1402190 T21-M0078
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/07/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | Plumbing vents require paint. Both cleanouts on south end near condenser need to be cut to grade. Provide ladder for attic access. |
10/07/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | Provide ladder for attic access. |
10/07/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | paint exterior vents. |
10/07/2024 | RSBU - Building Final | N/A | Re-inspection required | Cut cleanouts to grade. Paint exterior vents. Provide ladder for attic access. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00044
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/22/2024 | COT - RSPL - Backwater Valve | Passed | Underground plumbing, sewer, and backwater valve are properly installed and under a 10' water test with no leaks present. Okay to shade pipes and backfill trenches. | |
05/22/2024 | COT - RSPL - Yard Water Line | Passed | Water line is connected to the main water meter and is under street pressure. Blue tracer wire is installed from meter to house. Okay to shade pipe and backfill trench. | |
05/22/2024 | COT - RSPL - Sewer | Passed | Underground plumbing, sewer, and backwater valve are properly installed and under a 10' water test with no leaks present. Okay to shade pipes and backfill trenches. | |
05/22/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing, sewer, and backwater valve are properly installed and under a 10' water test with no leaks present. Okay to shade pipes and backfill trenches. | |
06/11/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/11/2024 | COT - RSBU - Preslab | Passed | ||
06/11/2024 | COT - RSEL - Electrical Underground | Passed | ||
06/11/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
07/02/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/02/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/26/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
07/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/30/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
08/15/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
09/23/2024 | COT - BULD - SWG Clearance | Passed | Passed SW gas clearance 9/23/23 | |
10/07/2024 | COT - RSEL - Outdoor Lighting | Passed | Approved. | |
10/07/2024 | ENGR Engineering Final | Passed | ||
10/07/2024 | RSBU - Building Progress | Passed | ||
10/08/2024 | COT - RSEL - Electrical Final | Passed | ||
10/08/2024 | COT - RSME - Mechanical Final | Passed | ||
10/08/2024 | COT - RSPL - Plumbing Final | Passed | ||
10/08/2024 | RSBU - Building Final | Passed |