Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
01/09/2024
Applicant:
Daria Hopkins
Description:
SFR MER1402370 T21-M0077 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0124-00042
Permit Status: Issued
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Start Date Submittal Complete Date Status  
02/01/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/06/2024 APPROVED Review Details
10/03/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/03/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0124-00042
Permit Status: Issued
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Date Description Comments
02/01/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/09/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/09/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
02/02/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0124-00042
Permite Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
09/03/2024 COT - RSBU - Roof Nailing N/A Re-inspection required 9/3/24: missing h25 clips in bedroom three front of house. Missing blocking at valley in bedroom three also. Missing nailing and rsp clips at front of house and south side of home. Master suite closet has incorrect header requires (2) 2x6s stopped inspection.
09/03/2024 COT - RSBU - Exterior Clips/Sheathing N/A Re-inspection required 9/3/24: missing h25 clips in bedroom three front of house. Missing blocking at valley in bedroom three also. Missing nailing and rsp clips at front of house and south side of home. Master suite closet has incorrect header requires (2) 2x6s stopped inspection.
COT - RSEL - Electrical Final N/A Scheduled
COT - RSEL - Outdoor Lighting N/A Scheduled
COT - RSME - Mechanical Final N/A Scheduled
COT - RSPL - Plumbing Final N/A Scheduled
ENGR Engineering Final N/A Requested
RSBU - Building Final N/A Scheduled

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0124-00042
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Total Completed Inspections - 16
Date Description Inspector Results Comments
08/08/2024 COT - RSPL - Sewer Passed
08/08/2024 COT - RSPL - Backwater Valve Passed
08/08/2024 COT - RSPL - Yard Water Line Passed
08/08/2024 COT - RSPL - Rough Soil Passed
08/15/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/15/2024 COT - RSBU - Preslab Passed
08/15/2024 COT - RSEL - Electrical Underground Passed
08/15/2024 COT - RSEL - Grounding/Bonding Passed
09/30/2024 COT - RSBU - Roof Nailing Passed 9/30/24: All items noted on 9/3/24 inspection have been corrected.
09/30/2024 COT - RSBU - Exterior Clips/Sheathing Passed 9/30/24: All items noted on 9/3/24 inspection have been corrected.
09/30/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall.
09/30/2024 COT - RSPL - Gas Pressure Test Passed Gas lines are properly installed and under 15 psi air pressure test with no leaks. Okay to proceed.
09/30/2024 BULD - Electrical Clearance Passed 9/30/24: All items noted on 9/3/24 inspection have been corrected.
09/30/2024 RSBU - Building Progress Passed
10/21/2024 COT - RSBU - Interior Shear Bracing Passed
12/04/2024 COT - BULD - SWG Clearance Passed Gas valves are installed at every gas appliance location. Okay to install meter.

Scheduled Inspections

Scheduled Inspections - TC-MDP-0124-00042
Status: Issued
Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Scheduled Date Description Entered By Entered Date
12/23/2024 COT - RSPL - Plumbing Final Scheduled
12/23/2024 RSBU - Building Final Scheduled
12/23/2024 COT - RSEL - Electrical Final Scheduled
12/23/2024 COT - RSME - Mechanical Final Scheduled
12/23/2024 COT - RSEL - Outdoor Lighting Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
149618 PT LOT 58 COMPLETE-2024-10-03_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 58 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 58 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 58 SPECIAL INSPECTION CERTIFICATE-2024-02-01_V1.PDF DOCUMENTS VIEW