Permit: TC-MDP-0124-00038
Permit Details
Apply Date:
01/08/2024
Applicant:
Daria Hopkins
Description:
SFR MERI150293 T21-M0067 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0124-00038
Permit Status: Complete
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/09/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/12/2024 | APPROVED |
09/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/26/2024 | APPROVED |
04/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/29/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00038
Permit Status: Complete
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Date | Description | Comments |
---|---|---|
01/09/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
01/09/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/09/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/11/2024 | Post-Tension Inspection Report is required. | |
01/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
04/29/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
01/11/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00038
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/06/2024 | COT - RSPL - Rough Soil | Passed | ||
03/06/2024 | COT - RSPL - Yard Water Line | Passed | ||
03/06/2024 | COT - RSPL - Sewer | Passed | ||
03/18/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, Post tension cabling is properly installed, Ufer ground is in place, rebar reinforcement is installed per plans, edge footing are properly dug and free of debris, underground electrical conduit is installed for kitchen island, all plumbing pipes are properly wrapped for protection, and tub/shower block outs are installed and properly secured. | |
03/18/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, Post tension cabling is properly installed, Ufer ground is in place, rebar reinforcement is installed per plans, edge footing are properly dug and free of debris, underground electrical conduit is installed for kitchen island, all plumbing pipes are properly wrapped for protection, and tub/shower block outs are installed and properly secured. | |
03/18/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, Post tension cabling is properly installed, Ufer ground is in place, rebar reinforcement is installed per plans, edge footing are properly dug and free of debris, underground electrical conduit is installed for kitchen island, all plumbing pipes are properly wrapped for protection, and tub/shower block outs are installed and properly secured. | |
03/18/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, Post tension cabling is properly installed, Ufer ground is in place, rebar reinforcement is installed per plans, edge footing are properly dug and free of debris, underground electrical conduit is installed for kitchen island, all plumbing pipes are properly wrapped for protection, and tub/shower block outs are installed and properly secured. | |
04/02/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
04/03/2024 | COT - RSBU - Roof Nailing | Passed | ||
05/07/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
05/07/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
05/07/2024 | BULD - Electrical Clearance | Passed | ||
05/07/2024 | RSBU - Building Progress | Passed | ||
07/10/2024 | COT - BULD - SWG Clearance | Passed | gas valves are installed at gas appliance locations. SWG Clearance issued. | |
07/22/2024 | RSBU - Building Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and fully functional. Electrical panel is properly labeled and has AFCI & GFCI Breakers installed per plan and code requirements. A/C Unit has proper breakers installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments have performed their inspections. | |
07/22/2024 | ENGR Engineering Final | Passed | ||
07/22/2024 | COT - RSPL - Plumbing Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and fully functional. Electrical panel is properly labeled and has AFCI & GFCI Breakers installed per plan and code requirements. A/C Unit has proper breakers installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments have performed their inspections. | |
07/22/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
07/22/2024 | COT - RSEL - Electrical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and fully functional. Electrical panel is properly labeled and has AFCI & GFCI Breakers installed per plan and code requirements. A/C Unit has proper breakers installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments have performed their inspections. | |
07/22/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed and functional. Light fixtures are what is specified on plans and meets city requirements. | |
07/22/2024 | COT - RSME - Mechanical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and fully functional. Electrical panel is properly labeled and has AFCI & GFCI Breakers installed per plan and code requirements. A/C Unit has proper breakers installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments have performed their inspections. |