Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
01/17/2024
Applicant:
Dana Petty
Description:
SFR MERI150293 T21-M0067 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0124-00037
Permit Status: Inspections complete
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Start Date Submittal Complete Date Status  
01/18/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/24/2024 APPROVED Review Details
06/13/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/14/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00037
Permit Status: Inspections complete
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Total Outstanding Activity Conditions - 1
Date Name
01/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0124-00037
Permit Status: Inspections complete
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Date Description Comments
01/18/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/18/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/22/2024 Post-Tension Inspection Report is required.
01/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/14/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/22/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00037
Permite Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/12/2024 COT - RSEL - Grounding/Bonding N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00037
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Total Completed Inspections - 20
Date Description Inspector Results Comments
04/08/2024 COT - RSPL - Rough Soil Passed
04/08/2024 COT - RSPL - Yard Water Line Passed
04/08/2024 COT - RSPL - Sewer Passed
04/12/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/15/2024 COT - RSBU - Preslab Passed
04/30/2024 COT - RSBU - Exterior Clips/Sheathing Passed
04/30/2024 COT - RSBU - Roof Nailing Passed
05/22/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in are complete. Okay to proceed with insulation and drywall installation.
05/22/2024 COT - RSEL - Electrical Underground Passed
05/22/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under 15# of air pressure with no leaks. Okay to proceed.
06/03/2024 BULD - Electrical Clearance Passed 6/3/24: The correct address label has been installed on the electrical panel.
06/21/2024 COT - RSBU - Interior Shear Bracing Passed
07/26/2024 COT - BULD - SWG Clearance Passed
08/15/2024 COT - RSEL - Electrical Final Passed
08/15/2024 COT - RSEL - Outdoor Lighting Passed
08/15/2024 COT - RSME - Mechanical Final Passed
08/15/2024 ENGR Engineering Final Passed
08/15/2024 RSBU - Building Progress Passed
08/16/2024 COT - RSPL - Plumbing Final Passed 8/16/24: Clean outs have been cut to grade. Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy.
08/16/2024 RSBU - Building Final Passed 8/16/24: Clean outs have been cut to grade. Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
146951 PT LOT 79 COMPLETE-2024-06-11_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 79 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 79 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 79 SPECIAL INSPECTION CERTIFICATE-2024-01-17_V1.PDF DOCUMENTS VIEW