Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/22/2024
Applicant:
Description:
SFR MERI156021 T21-M0063

Permit Reviews

Permit Number - TC-MDP-0124-00034
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Start Date Submittal Complete Date Status  
10/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/15/2024 APPROVED Review Details
01/22/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 01/31/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0124-00034
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Date Description Comments
01/22/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/22/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/22/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/25/2024 Post-Tension Inspection Report is required.
01/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
01/22/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/25/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00034
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/02/2024 COT - RSPL - Sewer Passed
05/02/2024 COT - RSPL - Rough Soil Passed
05/02/2024 COT - RSPL - Backwater Valve Passed
05/15/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 5/15/24: Passed ok to proceed
05/15/2024 COT - RSBU - Preslab Passed 5/15/24: Passed ok to proceed
05/15/2024 COT - RSEL - Electrical Underground Passed
05/15/2024 COT - RSEL - Grounding/Bonding Passed
06/10/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/10/2024 COT - RSBU - Roof Nailing Passed
07/03/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/03/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 7/3/2024
07/03/2024 COT - RSPL - Gas Pressure Test Passed
07/19/2024 COT - RSBU - Interior Shear Bracing Passed
09/06/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 9/6/2025
09/19/2024 COT - RSEL - Outdoor Lighting Passed
09/19/2024 COT - RSME - Mechanical Final Passed
09/19/2024 COT - RSPL - Plumbing Final Passed
09/19/2024 COT - RSPL - Yard Water Line Passed
09/19/2024 ENGR Engineering Final Passed CO Ready
09/20/2024 COT - RSEL - Electrical Final Passed 9-20-2024, receptacle added in bedroom together with all breakers being labeled in panel.
09/20/2024 RSBU - Building Final Passed Verified grade at pad for condenser together with catwalk in attic.
09/20/2024 RSBU - Building Progress Passed