Permit: TC-MDP-0124-00034
Permit Details
Apply Date:
01/22/2024
Applicant:
Daria Hopkins
Description:
SFR MERI156021 T21-M0063
Permit Reviews
Permit Number - TC-MDP-0124-00034
Permit Status: Issued
Permit Description: SFR MERI156021 T21-M0063
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/15/2024 | APPROVED |
01/22/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/31/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00034
Permit Status: Issued
Permit Description: SFR MERI156021 T21-M0063
Date | Description | Comments |
---|---|---|
01/22/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
01/22/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/22/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/25/2024 | Post-Tension Inspection Report is required. | |
01/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
01/22/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
01/25/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0124-00034
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/02/2024 | COT - RSPL - Sewer | Passed | ||
05/02/2024 | COT - RSPL - Rough Soil | Passed | ||
05/02/2024 | COT - RSPL - Backwater Valve | Passed | ||
05/15/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 5/15/24: Passed ok to proceed | |
05/15/2024 | COT - RSBU - Preslab | Passed | 5/15/24: Passed ok to proceed | |
05/15/2024 | COT - RSEL - Electrical Underground | Passed | ||
05/15/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
06/10/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
06/10/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/03/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/03/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 7/3/2024 | |
07/03/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
07/19/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
09/06/2024 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 9/6/2025 | |
09/19/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
09/19/2024 | COT - RSME - Mechanical Final | Passed | ||
09/19/2024 | COT - RSPL - Plumbing Final | Passed | ||
09/19/2024 | COT - RSPL - Yard Water Line | Passed | ||
09/19/2024 | ENGR Engineering Final | Passed | CO Ready | |
09/20/2024 | COT - RSEL - Electrical Final | Passed | 9-20-2024, receptacle added in bedroom together with all breakers being labeled in panel. | |
09/20/2024 | RSBU - Building Final | Passed | Verified grade at pad for condenser together with catwalk in attic. | |
09/20/2024 | RSBU - Building Progress | Passed |