Permit: TC-MDP-0124-00030
Permit Details
Apply Date:
01/08/2024
Applicant:
Daria Hopkins
Description:
SFR 230.2380 T21-M0028
Permit Reviews
Permit Number - TC-MDP-0124-00030
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/24/2024 | APPROVED |
08/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/13/2024 | APPROVED |
01/09/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/18/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00030
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Date | Description | Comments |
---|---|---|
01/09/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/09/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/11/2024 | Post-Tension Inspection Report is required. | |
01/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/13/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
01/11/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00030
Permit Description: SFR 230.2380 T21-M0028
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/11/2024 | COT - RSPL - Sewer | Passed | ||
06/11/2024 | COT - RSPL - Rough Soil | Passed | ||
06/11/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/18/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/18/2024 | COT - RSEL - Electrical Underground | Passed | ||
06/18/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
06/18/2024 | COT - RSBU - Preslab | Passed | ||
07/10/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Corrections were made. 7/10/2024 | |
07/10/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/31/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
07/31/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/02/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 8/2/2024 | |
08/20/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/04/2024 | COT - BULD - SWG Clearance | Passed | Southwest gas clearance. 10/4/2024 | |
10/15/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
10/15/2024 | COT - RSME - Mechanical Final | Passed | ||
10/15/2024 | ENGR Engineering Final | Passed | I spoke to the landscape boss myself and he is going to talk to his guys about the nursery stakes. Santa Rita Landscape |
|
10/15/2024 | RSBU - Building Progress | Passed | ||
10/18/2024 | COT - RSEL - Electrical Final | Passed | 10-18-24, final electrical approved. | |
10/18/2024 | COT - RSPL - Plumbing Final | Passed | 10-18-24. Listed items from previous inspection corrected. | |
10/18/2024 | RSBU - Building Final | Passed | 10-18-24, final approved. |