Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/08/2024
Applicant:
Daria Hopkins
Description:
SFR 230.2380 T21-M0028

Permit Reviews

Permit Number - TC-MDP-0124-00029
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Start Date Submittal Complete Date Status  
06/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/17/2024 APPROVED Review Details
01/09/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/18/2024 APPROVED Review Details
09/25/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/26/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0124-00029
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Date Description Comments
06/14/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/09/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/09/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/11/2024 Post-Tension Inspection Report is required.
01/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/14/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/11/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00029
Permit Description: SFR 230.2380 T21-M0028
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/09/2024 COT - RSPL - Rough Soil Passed
04/09/2024 COT - RSPL - Sewer Passed
04/09/2024 COT - RSPL - Yard Water Line Passed
04/16/2024 COT - RSEL - Grounding/Bonding Passed
04/16/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/16/2024 COT - RSEL - Electrical Underground Passed
04/16/2024 COT - RSBU - Preslab Passed
05/03/2024 COT - RSBU - Roof Nailing Passed
05/06/2024 COT - RSBU - Exterior Clips/Sheathing Passed
05/20/2024 BULD - Electrical Clearance Passed TEP ECO
05/24/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/24/2024 COT - RSPL - Gas Pressure Test Passed
06/10/2024 COT - RSBU - Interior Shear Bracing Passed
07/17/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 7/17/2024
08/09/2024 COT - RSEL - Outdoor Lighting Passed
08/09/2024 COT - RSPL - Plumbing Final Passed
08/20/2024 ENGR Engineering Final Passed Move in ready
08/09/2024 RSBU - Building Progress Passed
08/16/2024 COT - RSEL - Electrical Final Passed
08/16/2024 COT - RSME - Mechanical Final Passed
08/16/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
147010 PT LOT 28 COMPLETE-2024-06-11_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 28 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 28 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 28 SPECIAL INSPECTION CERTIFICATE-2024-01-08_V1.PDF DOCUMENTS VIEW