Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/02/2024
Applicant:
Daria Hopkins
Description:
SFR 230.2380 T21-M0028

Permit Reviews

Permit Number - TC-MDP-0124-00028
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Start Date Submittal Complete Date Status  
07/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/30/2024 APPROVED Review Details
10/28/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/29/2024 APPROVED Review Details
02/05/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/08/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0124-00028
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Date Description Comments
02/05/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/05/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/08/2024 Post-Tension Inspection Report is required.
01/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/30/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00028
Permite Description: SFR 230.2380 T21-M0028
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
10/15/2024 COT - RSEL - Outdoor Lighting N/A Re-inspection required Attic access does not have required clearance, all external pvc must be painted, missing light on back porch.
10/15/2024 COT - RSPL - Plumbing Final N/A Re-inspection required Attic access does not have required clearance, all external pvc must be painted, missing light on back porch.
10/15/2024 COT - RSEL - Electrical Final N/A Re-inspection required Attic access does not have required clearance, all external pvc must be painted, missing light on back porch.
10/15/2024 COT - RSME - Mechanical Final N/A Re-inspection required Attic access does not have required clearance, all external pvc must be painted, missing light on back porch.
10/15/2024 RSBU - Building Final N/A Re-inspection required Attic access does not have required clearance, all external pvc must be painted, missing light on back porch.
10/15/2024 RSBU - Building Progress N/A Re-inspection required Attic access does not have required clearance, all external pvc must be painted, missing light on back porch.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00028
Permit Description: SFR 230.2380 T21-M0028
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/12/2024 COT - RSPL - Yard Water Line Passed
06/12/2024 COT - RSPL - Rough Soil Passed
06/12/2024 COT - RSPL - Sewer Passed
06/21/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/21/2024 COT - RSBU - Preslab Passed 6/21/24: reinforcement and grounding per plan. Ok for concrete placement
06/21/2024 COT - RSEL - Electrical Underground Passed 6/21/24: reinforcement and grounding per plan. Ok for concrete placement
06/21/2024 COT - RSEL - Grounding/Bonding Passed 6/21/24: reinforcement and grounding per plan. Ok for concrete placement
07/12/2024 COT - RSBU - Exterior Clips/Sheathing Passed Corrections were made. 7/12/2024
07/12/2024 COT - RSBU - Roof Nailing Passed
08/02/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 8/2/2024
08/07/2024 COT - RSPL - Gas Pressure Test Passed
08/08/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/27/2024 COT - RSBU - Interior Shear Bracing Passed
10/03/2024 COT - BULD - SWG Clearance Passed 10/3/24: SWG Clearance ok for meter tag
10/18/2024 COT - RSEL - Outdoor Lighting Passed
10/18/2024 COT - RSPL - Plumbing Final Passed
11/05/2024 ENGR Engineering Final Passed
10/24/2024 COT - RSEL - Electrical Final Passed 10-24-24, all previous items noted from 10/18 have been corrected. Building final approved
10/24/2024 COT - RSME - Mechanical Final Passed 10-24-24, all previous items noted from 10/18 have been corrected. Building final approved
10/24/2024 RSBU - Building Final Passed 10-24-24, all previous items noted from 10/18 have been corrected. Building final approved
10/24/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
148435 PT LOT 35 COMPLETE-2024-07-26_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 35 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 35 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 35 SPECIAL INSPECTION CERTIFICATE-2024-02-02_V1.PDF DOCUMENTS VIEW