Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
11/08/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1383-130 T22-M0014 (Model masterplan TC-MDP-0223-00390)

Permit Reviews

Permit Number - TC-MDP-0124-00015
Permit Status: Inspections
Permit Description: SFR BT1383-130 T22-M0014 (Model masterplan TC-MDP-0223-00390)
Start Date Submittal Complete Date Status  
11/21/2024 SITE FROM MODEL PERMIT - PRODUCTION v.2 11/27/2024 APPROVED Review Details
11/14/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/14/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00015
Permit Status: Inspections
Permit Description: SFR BT1383-130 T22-M0014 (Model masterplan TC-MDP-0223-00390)
Total Outstanding Activity Conditions - 4
Date Name
11/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/22/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/22/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/22/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0124-00015
Permit Status: Inspections
Permit Description: SFR BT1383-130 T22-M0014 (Model masterplan TC-MDP-0223-00390)
Date Description Comments
11/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/04/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0124-00015
Permit Description: SFR BT1383-130 T22-M0014 (Model masterplan TC-MDP-0223-00390)
Total Completed Inspections - 14
Date Description Inspector Results Comments
12/10/2024 COT - RSPL - Yard Water Line Passed 12-10-24, main water line, sewer connection approved, underground plumbing, and back water valve verified. Okay to backfill with shading materials
12/10/2024 COT - RSPL - Backwater Valve Passed 12-10-24, main water line, sewer connection approved, underground plumbing, and back water valve verified. Okay to backfill with shading materials
12/10/2024 COT - RSPL - Rough Soil Passed 12-10-24, main water line, sewer connection approved, underground plumbing, and back water valve verified. Okay to backfill with shading materials
12/10/2024 COT - RSPL - Sewer Passed 12-10-24, main water line, sewer connection approved, underground plumbing, and back water valve verified. Okay to backfill with shading materials
12/18/2024 COT - RSEL - Electrical Underground Passed 12/18/24 no conduit for electrical chase under slab, pass, but proceed at own risk.
12/18/2024 COT - RSEL - Grounding/Bonding Passed 12/18/24 no conduit for electrical chase under slab, pass, but proceed at own risk.
12/19/2024 COT - RSBU - Preslab Passed 12-19-24, tendons on preslab together with rebar verified as per approved plans. Okay to pour concrete.
12/19/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 12-19-24, property pins in place. Verified excavation and setbacks as per approved plans. Okay to pour concrete.
01/08/2025 COT - RSBU - Exterior Clips/Sheathing Passed Roof sheathing is properly nailed to trusses, H2.5 clips are installed on exterior walls and trusses, all masa clips are properly secured to bottom plate with nails, and all bolts have washers and nuts installed. Okay to proceed with rough-in of mechanical, electrical, and plumbing.
01/08/2025 COT - RSBU - Roof Nailing Passed Roof sheathing is properly nailed to trusses, H2.5 clips are installed on exterior walls and trusses, all masa clips are properly secured to bottom plate with nails, and all bolts have washers and nuts installed. Okay to proceed with rough-in of mechanical, electrical, and plumbing.
01/28/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/28/25 AC return had not been attached or mounted with blocking on arrival. I was able to confirm corrections were made by video inspection. Pass. Ok to proceed.
01/28/2025 COT - RSPL - Gas Pressure Test Passed 1/28/26 pass
01/30/2025 BULD - Electrical Clearance Passed 1/30/25 Approval for TEP ECO
02/05/2025 COT - RSBU - Interior Shear Bracing Passed 2-5-25, interior shear bracing inspection approved. Okay to tape & texture drywall

Documents

File Name Document Type  
BELLA TIERRA PHASE 3 - LOT 9 START_V1.PDF DOCUMENTS VIEW
BTIII 9 SIC-2024-11-08_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW