Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
04/25/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1383-130 T22-M0014

Permit Reviews

Permit Number - TC-MDP-0124-00013
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Start Date Submittal Complete Date Status  
04/26/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00013
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Total Outstanding Activity Conditions - 6
Date Name
04/29/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/29/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/29/2024 Post-Tension Inspection Report is required.
04/29/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/29/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
11/22/2023 THIS DOES NOT APPLY

Conditions

Permit Number - TC-MDP-0124-00013
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Date Description Comments
01/04/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/22/2023 THIS DOES NOT APPLY

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00013
Permit Description: SFR BT1383-130 T22-M0014
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/09/2024 COT - RSPL - Rough Soil Passed
05/09/2024 COT - RSPL - Yard Water Line Passed
06/06/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/06/2024 COT - RSBU - Preslab Passed
06/06/2024 COT - RSEL - Electrical Underground Passed
06/06/2024 COT - RSEL - Grounding/Bonding Passed
06/24/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/24/2024 COT - RSBU - Roof Nailing Passed
08/08/2024 COT - RSPL - Gas Pressure Test Passed
08/12/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 8/12/24: Main water line pex is under 60 psi of air pressure. Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation.
08/30/2024 COT - RSBU - Interior Shear Bracing Passed Drywall for interior shear wall is secured to studs per plan specifications. Okay to proceed with tape, texture, and paint.
09/10/2024 COT - RSPL - Sewer Passed
09/26/2024 BULD - Electrical Clearance Passed PASSED ELECTRICAL CLEARANCE ECO 9/26/2024
10/22/2024 COT - BULD - SWG Clearance Passed 10/22/24 PASS. SWG clearence
11/18/2024 ENGR Engineering Final Passed CO Ready
11/19/2024 RSBU - Building Progress Passed
11/22/2024 COT - RSEL - Electrical Final Passed 11/22/24: All items noted on last inspection have been corrected. All mechanical, electrical, and plumbing fixtures are installed and fully functional. Okay to issue Certificate of Occupancy.
11/22/2024 COT - RSEL - Outdoor Lighting Passed 11/22/24: All items noted on last inspection have been corrected. All mechanical, electrical, and plumbing fixtures are installed and fully functional. Okay to issue Certificate of Occupancy.
11/22/2024 COT - RSME - Mechanical Final Passed 11/22/24: All items noted on last inspection have been corrected. All mechanical, electrical, and plumbing fixtures are installed and fully functional. Okay to issue Certificate of Occupancy.
11/22/2024 COT - RSPL - Plumbing Final Passed 11/22/24: All items noted on last inspection have been corrected. All mechanical, electrical, and plumbing fixtures are installed and fully functional. Okay to issue Certificate of Occupancy.
11/22/2024 RSBU - Building Final Passed 11/22/24: All items noted on last inspection have been corrected. All mechanical, electrical, and plumbing fixtures are installed and fully functional. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 24 START_V1.PDF DOCUMENTS VIEW
BTIII 24 SIC-2024-04-25_V1.PDF DOCUMENTS VIEW