Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0124-00013
Permit Details
Apply Date:
04/25/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1383-130 T22-M0014
Permit Reviews
Permit Number - TC-MDP-0124-00013
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00013
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
04/29/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
04/29/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/29/2024 | Post-Tension Inspection Report is required. |
04/29/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
04/29/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
11/22/2023 | THIS DOES NOT APPLY |
Conditions
Permit Number - TC-MDP-0124-00013
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Date | Description | Comments |
---|---|---|
01/04/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
11/22/2023 | THIS DOES NOT APPLY |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00013
Permit Description: SFR BT1383-130 T22-M0014
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/09/2024 | COT - RSPL - Rough Soil | Passed | ||
05/09/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/06/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/06/2024 | COT - RSBU - Preslab | Passed | ||
06/06/2024 | COT - RSEL - Electrical Underground | Passed | ||
06/06/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
06/24/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
06/24/2024 | COT - RSBU - Roof Nailing | Passed | ||
08/08/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8/12/24: Main water line pex is under 60 psi of air pressure. Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation. | |
08/30/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall for interior shear wall is secured to studs per plan specifications. Okay to proceed with tape, texture, and paint. | |
09/10/2024 | COT - RSPL - Sewer | Passed | ||
09/26/2024 | BULD - Electrical Clearance | Passed | PASSED ELECTRICAL CLEARANCE ECO 9/26/2024 | |
10/22/2024 | COT - BULD - SWG Clearance | Passed | 10/22/24 PASS. SWG clearence | |
11/18/2024 | ENGR Engineering Final | Passed | CO Ready | |
11/19/2024 | RSBU - Building Progress | Passed | ||
11/22/2024 | COT - RSEL - Electrical Final | Passed | 11/22/24: All items noted on last inspection have been corrected. All mechanical, electrical, and plumbing fixtures are installed and fully functional. Okay to issue Certificate of Occupancy. | |
11/22/2024 | COT - RSEL - Outdoor Lighting | Passed | 11/22/24: All items noted on last inspection have been corrected. All mechanical, electrical, and plumbing fixtures are installed and fully functional. Okay to issue Certificate of Occupancy. | |
11/22/2024 | COT - RSME - Mechanical Final | Passed | 11/22/24: All items noted on last inspection have been corrected. All mechanical, electrical, and plumbing fixtures are installed and fully functional. Okay to issue Certificate of Occupancy. | |
11/22/2024 | COT - RSPL - Plumbing Final | Passed | 11/22/24: All items noted on last inspection have been corrected. All mechanical, electrical, and plumbing fixtures are installed and fully functional. Okay to issue Certificate of Occupancy. | |
11/22/2024 | RSBU - Building Final | Passed | 11/22/24: All items noted on last inspection have been corrected. All mechanical, electrical, and plumbing fixtures are installed and fully functional. Okay to issue Certificate of Occupancy. |