Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0124-00012
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
4590 S VERDIN VALLEY DR
Address NEW:
4590 S VERDIN VALLEY DR
Apply Date:
04/04/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1383-130 T22-M0014
Permit Reviews
Permit Number - TC-MDP-0124-00012
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/01/2024 | REQUIRES RESUBMIT |
| 04/04/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 04/09/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00012
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 01/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 04/04/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 04/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 04/04/2024 | Post-Tension Inspection Report is required. |
| 04/04/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 04/04/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0124-00012
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
| Date | Description | Comments |
|---|---|---|
| 01/04/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 01/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00012
Permite Description: SFR BT1383-130 T22-M0014
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2024 | COT - RSEL - Electrical Underground | N/A | Not Applicable | Not required, peninsula counter not an island counter. |
| 10/03/2024 | COT - BULD - SWG Clearance | N/A | Re-inspection required | 10-3-24,Missing water heater and shutoff valve. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00012
Permit Description: SFR BT1383-130 T22-M0014
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2024 | COT - RSPL - Yard Water Line | Passed | Water meter is not connected. Water line is trenched from meter location to house and under 70# of air pressure and holding. Okay to shade pipe and backfill trench. | |
| 05/01/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is okay. Proceed with shading and backfilling trenches. | |
| 05/13/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly installed per plans, rebar reinforcement is in place per plans, underground plumbing pipes are properly wrapped with foam, shear wall and masa clips are secured to the form per the correct location on plans. Okay to proceed with concrete pour. | |
| 05/13/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly installed per plans, rebar reinforcement is in place per plans, underground plumbing pipes are properly wrapped with foam, shear wall and masa clips are secured to the form per the correct location on plans. Okay to proceed with concrete pour. | |
| 05/13/2024 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground is in place on right side of garage. | |
| 06/07/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 06/11/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 07/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 07/19/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 08/07/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall for interior shear walls is properly installed and secured to the studs with screws per plan requirements. Okay to proceed with tape, texture, and paint of all walls and ceilings. | |
| 09/09/2024 | COT - RSPL - Sewer | Passed | Sewer line is properly connected to underground plumbing. Okay to shade pipe and backfill trench. | |
| 10/10/2024 | BULD - Electrical Clearance | Passed | Corrections have been made 10/10/24 electrical clearance for TEP | |
| 10/15/2024 | COT - BULD - SWG Clearance | Passed | SWG FOR METER ONLY | |
| 10/23/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/23/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/23/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/23/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/23/2024 | ENGR Engineering Final | Passed | ||
| 10/23/2024 | RSBU - Building Final | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/23/2024 | RSBU - Building Progress | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. |