Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
01/04/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1383-130 T22-M0014

Permit Reviews

Permit Number - TC-MDP-0124-00011
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Start Date Submittal Complete Date Status  
01/04/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/09/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00011
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Total Outstanding Activity Conditions - 4
Date Name
01/04/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/04/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/09/2024 Post-Tension Inspection Report is required.
01/09/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0124-00011
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Date Description Comments
01/04/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00011
Permit Description: SFR BT1383-130 T22-M0014
Total Completed Inspections - 22
Date Description Inspector Results Comments
02/07/2024 COT - RSPL - Yard Water Line Passed
02/07/2024 COT - RSPL - Rough Soil Passed
02/07/2024 COT - RSPL - Sewer Passed
02/16/2024 COT - RSBU - Preslab Passed
02/16/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/16/2024 COT - RSEL - Electrical Underground Passed
02/16/2024 COT - RSEL - Grounding/Bonding Passed
03/07/2024 COT - RSBU - Roof Nailing Passed
03/11/2024 COT - RSBU - Exterior Clips/Sheathing Passed
04/11/2024 BULD - Electrical Clearance Passed TEP ECO
04/11/2024 COT - RSPL - Backwater Valve Passed
04/15/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/15/2024 COT - RSPL - Gas Pressure Test Passed
04/30/2024 COT - RSBU - Interior Shear Bracing Passed
06/14/2024 COT - BULD - SWG Clearance Passed SWG for meter only
07/11/2024 COT - RSEL - Electrical Final Passed
07/11/2024 COT - RSEL - Outdoor Lighting Passed
07/11/2024 COT - RSME - Mechanical Final Passed
07/11/2024 COT - RSPL - Plumbing Final Passed
07/11/2024 ENGR Engineering Final Passed
07/11/2024 RSBU - Building Progress Passed
07/12/2024 RSBU - Building Final Passed 7/12/24: Engineering passed their inspection. Okay to issue Certificate of Occupancy for this project.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 1 - LOT 91 START_V1.PDF DOCUMENTS VIEW
BT 91 SIC-2024-01-04_V1.PDF DOCUMENTS VIEW