Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0124-00003
Permit Details
Apply Date:
03/05/2024
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065
Permit Reviews
Permit Number - TC-MDP-0124-00003
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/05/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/15/2024 | APPROVED |
10/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/15/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00003
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Date | Description | Comments |
---|---|---|
03/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
03/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/15/2024 | Post-Installed Anchor Inspection Report is required. | |
03/15/2024 | Post-Tension Inspection Report is required. | |
01/02/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
03/15/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
03/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00003
Permite Description: SFR MERI213021 T21-M0065
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/10/2024 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | Per previous notes. 9/10/2024 |
09/10/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | Per previous notes. 9/10/2024 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00003
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/09/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 9/8/2024 | |
08/09/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 9/8/2024 | |
08/09/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 9/8/2024 | |
08/19/2024 | COT - RSBU - Preslab | Passed | ||
08/19/2024 | COT - RSEL - Electrical Underground | Passed | ||
08/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/19/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
09/17/2024 | COT - RSBU - Roof Nailing | Passed | ||
09/19/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
10/01/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 10/1/2024 | |
10/01/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
10/01/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
10/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | Passed interior shear wall inspection 10/16/24 | |
12/05/2024 | COT - BULD - SWG Clearance | Passed | 12-5-24, approved for Southwest Gas Company to install meter. | |
12/13/2024 | COT - RSEL - Electrical Final | Passed | Passed final 12/13/24 CLEARANCE ECO |
|
12/13/2024 | COT - RSEL - Outdoor Lighting | Passed | No | |
12/13/2024 | COT - RSME - Mechanical Final | Passed | Passed final 12/13/24 | |
12/13/2024 | COT - RSPL - Plumbing Final | Passed | Passed final 12/13/24 | |
12/13/2024 | ENGR Engineering Final | Passed | Cut down and glue the clean outs, if hidden behind landscape of some sort like a big rock you don't have to cut them down but they need to be glued. | |
12/13/2024 | RSBU - Building Final | Passed | Passed final 12/13/24 | |
12/13/2024 | RSBU - Building Progress | Passed | Passed final 12/13/24 |