Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0124-00002
Permit Details
Apply Date:
03/29/2024
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065
Permit Reviews
Permit Number - TC-MDP-0124-00002
Permit Status: Inspections
Permit Description: SFR MERI213021 T21-M0065
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/09/2024 | APPROVED |
04/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/04/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00002
Permit Status: Inspections
Permit Description: SFR MERI213021 T21-M0065
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
04/03/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
04/03/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
04/03/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/03/2024 | Post-Tension Inspection Report is required. |
04/03/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0124-00002
Permit Status: Inspections
Permit Description: SFR MERI213021 T21-M0065
Date | Description | Comments |
---|---|---|
01/02/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0124-00002
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/07/2024 | COT - RSPL - Yard Water Line | Passed | 11-7-24, main water line inspection approved. Okay to backfill with shading. | |
11/07/2024 | COT - RSPL - Sewer | Passed | 11-7-24, sewer inspection approved. Okay to backfill with shading. | |
11/07/2024 | COT - RSPL - Rough Soil | Passed | 11-7-24, underground plumbing inspection approved. Okay to backfill with shading. | |
11/07/2024 | COT - RSPL - Backwater Valve | Passed | 11-7-24, backwater valve inspection approved. Okay to backfill with shading. |