Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/25/2023
Applicant:
Celina Rodriguez
Description:
SFR BT2191-30 T22-M0009

Permit Reviews

Permit Number - TC-MDP-0123-00359
Permit Status: Complete
Permit Description: SFR BT2191-30 T22-M0009
Start Date Submittal Complete Date Status  
02/15/2023 RESIDENTIAL NEW DWELLING v.1 02/16/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0123-00359
Permit Status: Complete
Permit Description: SFR BT2191-30 T22-M0009
Total Outstanding Activity Conditions - 7
Date Name
02/16/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
02/16/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/16/2023 Post-Installed Anchor Inspection Report is required.
02/16/2023 Post-Tension Inspection Report is required.
02/16/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0123-00359
Permite Description: SFR BT2191-30 T22-M0009
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/01/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready Not ready. Missing anchor bolts behind shear walls and edges of bottom plates. Secure gas line. Laundry circuit is not connected. 2x6 top plate in laundry room needs to be corrected. Duct work is choked. Have separate straps. Tape off connection at cuppling in 1st bathroom. Block at register in bathroom. Nail of girder h25. 5/1/2023

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0123-00359
Permit Description: SFR BT2191-30 T22-M0009
Total Completed Inspections - 24
Date Description Inspector Results Comments
03/17/2023 COT - RSPL - Yard Water Line Passed
03/17/2023 COT - RSPL - Rough Soil Passed
03/17/2023 COT - RSPL - Sewer Passed
03/24/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Post tension cables are in place, compaction is complete. Okay to pour concrete slabs.
03/24/2023 COT - RSBU - Preslab Passed 3-24-23: Post tension cables are in place, compaction is complete. Okay to pour concrete slabs.
03/24/2023 COT - RSEL - Electrical Underground Passed 3-24-23: Electrical conduit for kitchen island is installed. Okay to pour concrete slab.
04/10/2023 COT - RSBU - Roof Nailing Passed
04/12/2023 COT - RSBU - Exterior Clips/Sheathing Passed Approved. 4/12/2023
05/01/2023 COT - RSPL - Gas Pressure Test Passed
05/03/2023 RSEL - Electrical Progress Passed
05/03/2023 RSME - Mechanical Progress Passed
05/03/2023 RSPL - Plumbing Progress Passed
05/03/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/04/2023 COT - RSEL - Grounding/Bonding Passed
05/15/2023 COT - RSBU - Interior Shear Bracing Passed
05/25/2023 BULD - Electrical Clearance Passed
07/18/2023 COT - BULD - SWG Clearance Passed 7/18/23: SWG meter tag only
08/09/2023 RSBU - Building Final Passed
08/09/2023 COT - RSPL - Plumbing Final Passed
08/09/2023 COT - RSPL - Gas Final Passed
08/09/2023 COT - RSEL - Outdoor Lighting Passed
08/09/2023 RSBU - Building Progress Passed
08/09/2023 COT - RSME - Mechanical Final Passed
08/11/2023 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA - LOT 78 START_V1.PDF DOCUMENTS VIEW
BTII 78 SIC-2023-02-14_V1.PDF DOCUMENTS VIEW