Permit: TC-MDP-0123-00358
Permit Details
Apply Date:
01/25/2023
Applicant:
Celina Rodriguez
Description:
SFR BT2191-30 T22-M0009
Permit Reviews
Permit Number - TC-MDP-0123-00358
Permit Status: Complete
Permit Description: SFR BT2191-30 T22-M0009
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/27/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/03/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0123-00358
Permit Status: Complete
Permit Description: SFR BT2191-30 T22-M0009
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
02/01/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
02/01/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
02/01/2023 | Post-Installed Anchor Inspection Report is required. |
02/01/2023 | Post-Tension Inspection Report is required. |
02/01/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00358
Permite Description: SFR BT2191-30 T22-M0009
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/20/2023 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required | 4/20/23- mechanical must be properly secured at all points to appropriate register box. |
04/20/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 4/20/23- mechanical must be properly secured at all points to appropriate register box. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00358
Permit Description: SFR BT2191-30 T22-M0009
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/27/2023 | COT - RSPL - Yard Water Line | Passed | Water lines is under 50 pounds of air pressure and holding. City has not installed water meter at this time. Okay to backfill trenches. | |
02/27/2023 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to the main sewer system. Okay to backfill trenches | |
02/27/2023 | COT - RSPL - Rough Soil | Passed | Underground plumbing is installed and under water test. Okay to backfill trenches. | |
03/06/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
03/06/2023 | COT - RSEL - Electrical Underground | Passed | ||
03/06/2023 | COT - RSBU - Preslab | Passed | ||
03/21/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
03/21/2023 | COT - RSBU - Roof Nailing | Passed | ||
04/21/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
04/21/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
05/03/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
05/05/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
07/14/2023 | COT - BULD - SWG Clearance | Passed | ||
08/01/2023 | RSBU - Building Progress | Passed | ||
08/01/2023 | COT - RSPL - Gas Final | Passed | ||
08/01/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/01/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/01/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
08/01/2023 | COT - RSEL - Electrical Final | Passed | ||
08/03/2023 | RSBU - Building Final | Passed | ||
08/03/2023 | COT - RSME - Mechanical Final | Passed |