Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
12/19/2022
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011

Permit Reviews

Permit Number - TC-MDP-0123-00355
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011
Start Date Submittal Complete Date Status  
01/29/2025 RESIDENTIAL NEW DWELLING v.1 02/24/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0123-00355
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011
Total Outstanding Activity Conditions - 2
Date Name
01/30/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/30/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-0123-00355
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011
Date Description Comments
01/29/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/30/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00355
Permite Description: SFR BT1465-130 T22-M0011
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
03/18/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 18 March 25
1. Truss A7G missing JUS 26 hangers at points 21, 22 and 23.
2. Blocking needed at A5 and A4
3. Patio roof framing not per plan. Please submit approved plans.
03/18/2025 COT - RSBU - Roof Nailing N/A Re-inspection required 18 March 25
1. Truss A7G missing JUS 26 hangers at points 21, 22 and 23.
2. Blocking needed at A5 and A4
3. Patio roof framing not per plan. Please submit approved plans.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00355
Permit Description: SFR BT1465-130 T22-M0011
Total Completed Inspections - 20
Date Description Inspector Results Comments
02/26/2025 COT - RSPL - Yard Water Line Passed 02/26/25
Ok to backfill, shading required.
02/26/2025 COT - RSPL - Sewer Passed
02/26/2025 COT - RSPL - Rough Soil Passed 02/26/25
Ok to backfill, shading required.
03/04/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
03/04/2025 COT - RSBU - Preslab Passed
03/04/2025 COT - RSEL - Electrical Underground Passed
03/25/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 3/25/25 corrections made
03/25/2025 COT - RSBU - Roof Nailing Passed 3/25/25 corrections made
04/03/2025 COT - RSEL - Grounding/Bonding Passed
04/03/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/03/2025 COT - RSPL - Gas Pressure Test Passed
04/14/2025 COT - RSBU - Interior Shear Bracing Passed Passed 4/14/25 ok to tape
06/03/2025 COT - BULD - SWG Clearance Passed 6/3/25
Southwest gas: SWG
06/11/2025 RSBU - Building Progress Passed passed 6/11/25
06/11/2025 COT - RSEL - Electrical Final Passed passed 6/11/25
06/11/2025 COT - RSEL - Outdoor Lighting Passed passed 6/11/25
06/11/2025 COT - RSME - Mechanical Final Passed passed 6/11/25
06/11/2025 COT - RSPL - Gas Final Passed passed 6/11/25
06/13/2025 RSBU - Building Final Passed Passed 6/13/25
06/13/2025 COT - RSPL - Plumbing Final Passed Passed 6/13/25

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 65 START_V1.PDF DOCUMENTS VIEW
BTIII 65 SIC-2025-01-24_V1.PDF DOCUMENTS VIEW