Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
12/19/2022
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011

Permit Reviews

Permit Number - TC-MDP-0123-00353
Permit Status: Complete
Permit Description: SFR BT1465-130 T22-M0011
Start Date Submittal Complete Date Status  
02/03/2023 RESIDENTIAL NEW DWELLING v.1 02/07/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0123-00353
Permit Status: Complete
Permit Description: SFR BT1465-130 T22-M0011
Total Outstanding Activity Conditions - 7
Date Name
02/06/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
02/06/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/06/2023 Post-Installed Anchor Inspection Report is required.
02/06/2023 Post-Tension Inspection Report is required.
02/06/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0123-00353
Permit Description: SFR BT1465-130 T22-M0011
Total Completed Inspections - 21
Date Description Inspector Results Comments
03/03/2023 COT - RSPL - Rough Soil Passed
03/10/2023 COT - RSEL - Grounding/Bonding Passed
03/10/2023 COT - RSBU - Preslab Passed
03/10/2023 COT - RSEL - Electrical Underground Passed
03/10/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
03/20/2023 COT - RSBU - Roof Nailing Passed
03/20/2023 COT - RSBU - Exterior Clips/Sheathing Passed
04/18/2023 COT - RSPL - Gas Pressure Test Passed
04/18/2023 COT - RSPL - Sewer Passed
04/18/2023 COT - RSPL - Yard Water Line Passed
04/20/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Reconnect fan box in great room. Leak under bathroom tub. Fix flu pipe in upward pitch. More nails in hsa strap at kitchen hood.

4/20/23- pass
04/27/2023 COT - RSBU - Interior Shear Bracing Passed
05/03/2023 BULD - Electrical Clearance Passed TEP ECO
07/10/2023 COT - BULD - SWG Clearance Passed
07/26/2023 COT - RSME - Mechanical Final Passed
07/26/2023 COT - RSPL - Gas Final Passed
07/26/2023 COT - RSPL - Plumbing Final Passed
07/26/2023 COT - RSEL - Outdoor Lighting Passed
07/26/2023 COT - RSEL - Electrical Final Passed
07/26/2023 RSBU - Building Final Passed
07/26/2023 RSBU - Building Progress Passed