Permit: TC-MDP-0123-00317
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
2382 S CLOVIS PL
Address NEW:
2382 S CLOVIS PL
Apply Date:
09/11/2023
Applicant:
Description:
SFR PANT2022 T22-M0073
Permit Reviews
Permit Number - TC-MDP-0123-00317
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/12/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/13/2023 | REQUIRES RESUBMIT |
| 11/02/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.4 | 11/07/2023 | APPROVED |
| 09/14/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 09/19/2023 | REQUIRES RESUBMIT |
| 03/26/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/28/2025 | APPROVED |
| 10/25/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.3 | 10/26/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0123-00317
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
| Date | Description | Comments |
|---|---|---|
| 09/12/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/12/2023 | Post-Tension Inspection Report is required. | |
| 06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 03/28/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00317
Permite Description: SFR PANT2022 T22-M0073
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | site does not use gas |
| 09/17/2024 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | 9/17/24: not ready needed permit extended. |
| 03/25/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | site does not use gas |
| 09/30/2024 | RSBU - Building Progress | N/A | Partial Pass | interior trim out ongoing. exterior painting ongoing. block fence is installed, gates not installed. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00317
Permit Description: SFR PANT2022 T22-M0073
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2023 | COT - RSPL - Rough Soil | Passed | ||
| 12/19/2023 | COT - RSPL - Sewer | Passed | ||
| 12/19/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 12/29/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 12/29/2023 | COT - RSBU - Preslab | Passed | ||
| 12/29/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 02/08/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 02/08/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 02/28/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 02/28/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 04/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
| 04/19/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall is properly installed and secured to the studs and ceiling joists. Okay to proceed with tape, texture, and painting. | |
| 03/25/2025 | COT - RSEL - Electrical Final | Passed | Passed final 3/25/25 CLEARANCE ECO | |
| 03/25/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 3/25/25 | |
| 03/25/2025 | COT - RSME - Mechanical Final | Passed | Passed final 3/25/25 | |
| 03/25/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 03/25/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 3/25/25 | |
| 03/25/2025 | RSBU - Building Final | Passed | Passed final 3/25/25 | |
| 03/25/2025 | RSBU - Building Progress | Passed | Passed final 3/25/25 |