Permit: TC-MDP-0123-00316
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
2405 S CLOVIS PL
Address NEW:
2405 S CLOVIS PL
Apply Date:
01/04/2024
Applicant:
Description:
SFR PANT2022 T22-M0073
Permit Reviews
Permit Number - TC-MDP-0123-00316
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/01/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/11/2024 | APPROVED |
| 01/26/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 02/08/2024 | APPROVED |
| 04/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/16/2025 | APPROVED |
| 01/04/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 01/16/2024 | REQUIRES RESUBMIT |
| 02/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/27/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0123-00316
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
| Date | Description | Comments |
|---|---|---|
| 01/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/12/2024 | Post-Tension Inspection Report is required. | |
| 01/04/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/09/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 01/12/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00316
Permite Description: SFR PANT2022 T22-M0073
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/30/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | Not Applicable-No gas to building. |
| 08/30/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | Not Applicable-No gas to building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00316
Permit Description: SFR PANT2022 T22-M0073
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/25/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 04/25/2024 | COT - RSPL - Rough Soil | Passed | ||
| 04/25/2024 | COT - RSPL - Sewer | Passed | ||
| 04/25/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 05/10/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
| 05/10/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
| 05/10/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
| 06/05/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Plywood sheathing is properly secured to studs with nails per plan requirements. Shear wall hold downs are properly nailed to studs. Straps are installed at headers of large openings. Okay to proceed with rough-in of mechanical, electrical, and plumbing. | |
| 06/05/2024 | COT - RSBU - Roof Nailing | Passed | Roof sheathing is properly installed and attached to trusses with nails per plans. Trusses are secured to top plate with H2.5 clips. Okay to proceed. | |
| 06/17/2024 | COT - RSEL - Electrical Underground | Passed | Sweep and conduit are properly secured to electrical panel and ran out to TEP's transformer. Okay to shade conduit and backfill trench. | |
| 06/21/2024 | BULD - Electrical Clearance | Passed | ||
| 08/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation work. | |
| 08/30/2024 | COT - RSBU - Interior Shear Bracing | Passed | Not required, no interior shear walls on building. | |
| 02/25/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/09/2025 | COT - RSEL - Electrical Final | Passed | 4-9-25, outdoor lighting, electrical, mechanical, plumbing and building final approved. | |
| 04/09/2025 | COT - RSME - Mechanical Final | Passed | 4-9-25, outdoor lighting, electrical, mechanical, plumbing and building final approved. | |
| 04/09/2025 | COT - RSPL - Plumbing Final | Passed | 4-9-25, outdoor lighting, electrical, mechanical, plumbing and building final approved. | |
| 04/09/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 04/09/2025 | RSBU - Building Final | Passed | 4-9-25, outdoor lighting, electrical, mechanical, plumbing and building final approved. | |
| 04/09/2025 | RSBU - Building Progress | Passed |