Permit: TC-MDP-0123-00307
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
2414 S CLOVIS PL
Address NEW:
2414 S CLOVIS PL
Apply Date:
09/11/2023
Applicant:
Description:
SFR PANT2022 T22-M0073
Permit Reviews
Permit Number - TC-MDP-0123-00307
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/25/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 10/25/2023 | REQUIRES RESUBMIT |
| 11/02/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.3 | 11/05/2023 | APPROVED |
| 04/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/21/2025 | APPROVED |
| 09/14/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/19/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0123-00307
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
| Date | Description | Comments |
|---|---|---|
| 09/14/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/14/2023 | Post-Tension Inspection Report is required. | |
| 06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 09/14/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00307
Permite Description: SFR PANT2022 T22-M0073
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | site does not use gas |
| 04/07/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | site does not use gas |
| 10/23/2024 | ENGR Engineering Final | N/A | Not Ready | |
| 10/22/2024 | RSBU - Building Progress | N/A | Partial Pass | called in for permit extension. 10/22/2024 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00307
Permit Description: SFR PANT2022 T22-M0073
Total Completed Inspections - 19