Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0123-00306
Permit Details
Apply Date:
09/11/2023
Applicant:
Description:
SFR PANT2022 T22-M0073
Permit Reviews
Permit Number - TC-MDP-0123-00306
Permit Status: Issued
Permit Description: SFR PANT2022 T22-M0073
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/11/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/14/2023 | REQUIRES RESUBMIT |
09/14/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 09/14/2023 | APPROVED |
09/14/2023 | RESTAMP - RESIDENTIAL v.1 | 09/15/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0123-00306
Permit Status: Issued
Permit Description: SFR PANT2022 T22-M0073
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
09/11/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
09/11/2023 | Post-Tension Inspection Report is required. |
09/11/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0123-00306
Permit Status: Issued
Permit Description: SFR PANT2022 T22-M0073
Date | Description | Comments |
---|---|---|
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
09/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0123-00306
Permite Description: SFR PANT2022 T22-M0073
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/06/2023 | COT - RSPL - Rough Soil | N/A | Re-inspection required | 1-Vent connections at bathrooms are not per approved plans. 2-Gray water piping is not per approved plans. |
08/20/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
09/05/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | Not Applicable--there is no gas in this subdivision. |
09/05/2024 | RSBU - Building Progress | N/A | Partial Pass | Construction crews are completing interior finishes and fixtures. Sidewalks and driveways are not poured. |
09/17/2024 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | 9/17/24: not ready needed permit extended. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0123-00306
Permit Description: SFR PANT2022 T22-M0073
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/20/2023 | COT - RSPL - Rough Soil | Passed | ||
10/27/2023 | COT - RSPL - Yard Water Line | Passed | ||
11/02/2023 | COT - RSBU - Preslab | Passed | ||
11/03/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
11/16/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
12/22/2023 | COT - RSPL - Sewer | Passed | ||
12/29/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | Exterior shear walls are properly installed and nailed off per plans. H2.5 clips are installed on every rafter. Headers are installed and sized per plans. All hurricane straps are properly nailed off. | |
12/29/2023 | COT - RSBU - Roof Nailing | Passed | All roof sheathing is properly installed and nailed off. | |
02/01/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
02/01/2024 | COT - RSEL - Electrical Underground | Passed | ||
02/28/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
03/21/2024 | COT - RSBU - Interior Shear Bracing | Passed |