Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0123-00305
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
2469 S CLOVIS PL
Address NEW:
2469 S CLOVIS PL
Apply Date:
09/21/2023
Applicant:
Description:
SFR PANT2022 T22-M0073
Permit Reviews
Permit Number - TC-MDP-0123-00305
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/22/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/27/2023 | REQUIRES RESUBMIT |
| 01/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/17/2025 | APPROVED |
| 09/28/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 10/03/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0123-00305
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
| Date | Description | Comments |
|---|---|---|
| 01/16/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 09/22/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 10/02/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00305
Permit Description: SFR PANT2022 T22-M0073
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/05/2023 | COT - RSPL - Backwater Valve | Passed | ||
| 12/05/2023 | COT - RSPL - Rough Soil | Passed | ||
| 12/05/2023 | COT - RSPL - Sewer | Passed | ||
| 12/05/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 12/12/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 12/12/2023 | COT - RSBU - Preslab | Passed | ||
| 12/12/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 01/17/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 01/19/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 01/31/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 03/08/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. All penetration are foamed and piping/wire protection is in place were needed. Okay to proceed with installation of insulation and drywall. | |
| 04/01/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall is properly secured to studs per plans. Okay to proceed with tape, texture, and painting of walls and ceilings. | |
| 09/09/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is fully operational and installed per plans and city regulations. | |
| 12/05/2024 | COT - BULD - SWG Clearance | Passed | ||
| 12/05/2024 | COT - RSEL - Electrical Final | Passed | ||
| 12/05/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 12/05/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 12/05/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 12/05/2024 | ENGR Engineering Final | Passed | CO Ready | |
| 12/05/2024 | RSBU - Building Final | Passed | ||
| 12/05/2024 | COT - RSME - Mechanical Final | Passed |