Permit: TC-MDP-0123-00301
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
2453 S CLOVIS PL
Address NEW:
2453 S CLOVIS PL
Apply Date:
10/09/2023
Applicant:
Description:
SFR PANT2022 T22-M0073
Permit Reviews
Permit Number - TC-MDP-0123-00301
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/16/2025 | APPROVED |
| 10/10/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/11/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0123-00301
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
| Date | Description | Comments |
|---|---|---|
| 01/16/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 01/16/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 03/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 03/15/2024 | Post-Tension Inspection Report is required. | |
| 06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 10/10/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00301
Permite Description: SFR PANT2022 T22-M0073
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/26/2023 | COT - RSPL - Sewer | N/A | Canceled | Canceled per wet soils. 12/26/2023 |
| 11/27/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | Not required--no gas onsite. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00301
Permit Description: SFR PANT2022 T22-M0073
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/16/2023 | COT - RSPL - Rough Soil | Passed | ||
| 11/24/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 11/29/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar reinforcement is in place, post tension cabling is installed and inspected by a third party inspector, all plumbing pipes are properly wrapped for protection from concrete. Okay to pour concrete footings and slab on grade. | |
| 11/29/2023 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground is in place okay to pour concrete footings and slab. | |
| 11/29/2023 | COT - RSBU - Preslab | Passed | Rebar reinforcement is in place, post tension cabling is installed and inspected by a third party inspector, all plumbing pipes are properly wrapped for protection from concrete. Okay to pour concrete footings and slab on grade. | |
| 12/28/2023 | COT - RSPL - Backwater Valve | Passed | ||
| 12/28/2023 | COT - RSPL - Sewer | Passed | ||
| 01/22/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 01/22/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 01/31/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 01/31/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 03/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/27/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 09/09/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is fully operational and installed per plans and city regulations. | |
| 11/27/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete. All mechanical, electrical, and plumbing fixtures are fully operational. Okay to issue Certificate of Occupancy. | |
| 11/27/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete. All mechanical, electrical, and plumbing fixtures are fully operational. Okay to issue Certificate of Occupancy. | |
| 11/27/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete. All mechanical, electrical, and plumbing fixtures are fully operational. Okay to issue Certificate of Occupancy. | |
| 11/27/2024 | RSBU - Building Final | Passed | Construction is complete. All mechanical, electrical, and plumbing fixtures are fully operational. Okay to issue Certificate of Occupancy. | |
| 11/27/2024 | ENGR Engineering Final | Passed | ||
| 12/05/2024 | COT - BULD - SWG Clearance | Passed | ||
| 12/05/2024 | RSBU - Building Progress | Passed |