Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
2485 S CLOVIS PL
Address NEW:
2485 S CLOVIS PL
Apply Date:
09/21/2023
Applicant:
Description:
SFR PANT2022 T22-M0073

Permit Reviews

Permit Number - TC-MDP-0123-00300
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
Start Date Submittal Complete Date Status  
04/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/21/2025 REQUIRES RESUBMIT Review Details
09/22/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/27/2023 REQUIRES RESUBMIT Review Details
02/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/26/2025 APPROVED Review Details
09/28/2023 SITE FROM MODEL PERMIT - PRODUCTION v.2 10/03/2023 APPROVED Review Details
04/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 04/21/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0123-00300
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
Date Description Comments
09/22/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
10/02/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0123-00300
Permite Description: SFR PANT2022 T22-M0073
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
09/05/2024 COT - BULD - SWG Clearance N/A Not Applicable Not Applicable--there is no gas in this subdivision.
09/05/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable Not Applicable--there is no gas in this subdivision.
09/17/2024 COT - RSEL - Outdoor Lighting N/A Not Ready 9/17/24: not ready needed permit extended.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0123-00300
Permit Description: SFR PANT2022 T22-M0073
Total Completed Inspections - 20
Date Description Inspector Results Comments
12/14/2023 COT - RSPL - Backwater Valve Passed
12/14/2023 COT - RSPL - Rough Soil Passed
12/14/2023 COT - RSPL - Sewer Passed
12/14/2023 COT - RSPL - Yard Water Line Passed
12/22/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
12/22/2023 COT - RSBU - Preslab Passed
12/22/2023 COT - RSEL - Grounding/Bonding Passed
01/25/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
01/25/2024 COT - RSBU - Roof Nailing Passed
01/31/2024 BULD - Electrical Clearance Passed TEP ECO
01/31/2024 COT - RSEL - Electrical Underground Passed
03/27/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/03/2024 COT - RSBU - Interior Shear Bracing Passed Drywall is properly screwed to studs and rafters. Okay to proceed with tape, texture, and paint.
02/03/2025 ENGR Engineering Final Passed
02/07/2025 COT - RSEL - Electrical Final Passed Construction is complete, house is ready for move in. Okay to issue Certificate of Occupancy.
02/07/2025 COT - RSEL - Outdoor Lighting Passed Construction is complete, house is ready for move in. Okay to issue Certificate of Occupancy.
02/07/2025 COT - RSME - Mechanical Final Passed Construction is complete, house is ready for move in. Okay to issue Certificate of Occupancy.
02/07/2025 COT - RSPL - Plumbing Final Passed Construction is complete, house is ready for move in. Okay to issue Certificate of Occupancy.
02/07/2025 RSBU - Building Final Passed Construction is complete, house is ready for move in. Okay to issue Certificate of Occupancy.
02/07/2025 RSBU - Building Progress Passed Construction is complete, house is ready for move in. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
FINAL REVISED SI CERT 4.07.2025 LOT 20.1-2025-04-14_V1.PDF DOCUMENTS VIEW
SI CERT LOT 20.1-2025-02-20_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
RESPONSE LETTER LOT 24. 2453 S CLOVIS_V1.PDF DOCUMENTS VIEW
SI CERT LOT 20_V1.PDF DOCUMENTS VIEW
SITE PLAN LOT 24 00300_V2.PDF DOCUMENTS VIEW